PVC WPC profile hauling machine traction machine haul off machine

Share on:


Price:$1,000.00
Price in USD:Details

Quantity:


Product Overview

Description



Products Description


Plastic pipe/profile/board hual off machine


caterpillar type shaped plastic material drawer adopts double caterpillar drawing method, thyristor stepless governor. It is mainly uesd with a plastic extruder for plastic pipe material, soft pipe and other plastic shaped materials. Its applicability is wide and its usage is convenient.


Hauling pipe
32-630mm
Type
1200-2000
Hauling force
7.5~30KN
Speed
0.5~2.5m/m










In order to better give you professional answers, when sending the inquiry, please describe your parameters or technical
requirements (such as: processing materials, output size, capacity, etc.) and attach your contact information (such as phone number, e-mail, facebook, whatsapp, wechat, etc.)




FAQ


Q:Are you machinery factory or trading company?
A:We are machinery factory

Q:If we have very special request for the production line,could you help me to do the design?
A:Experienced mechanical designer customized-design provided.

Q: Installation and stuff training available from you?
A: Yes, our engineers will guide machine installation and train your workers.

Q: How can we visit your company and machines?
A : Our factory is in Jiaozhou Town, Qingdao City, Shandong Province, China. About 1 hours from Qingdao International Ariport.

Q:What`s the payment method?
A: T/T, L/C,Western Union,etc


After sales service


- After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply,
water supply, labors and cranes, etc.

- Fullwin will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.

- The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD100 per day for each engineer.

- Engineer will give free training lessons to labors in buyer's factory.

- If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.


About US






0.0111 s.