manhole cover lift key/ T keys for stainless steel manhole cover/aluminium manhole frame (1600171130902)

Share on:


Price:$19.99 - $20.00
Price in USD:Details

Quantity:


Product Overview

Description


Ningbo Bozon Machinery Co., Ltd. is an OEM manufacotry from Ningbo,China.


 


We specialized in all kinds of metal production, in structural welding and machining, CNC precision machining,aluminum manhole cover production, aluminum machining and welding , structural parts stamping, bending, robot automatic welding, and we are in this filed for 12 years already.


.Our main range of manhole covers with aluminium and stainless steel materials provide internally and externally use for floor,road,driveway,garden or show rooms and other areas where the best aesthetic finish is required.
.Frame & cover are made of extruded aluminium profile and galvanized stainless steel
.Easy to lift with threaded lifting keys


.We can follow your dimentions and requirements per your design.


 experieces.jpg


 


 


 


 


MT-LightPro06/08/10


Data Sheet






































































NumberExterior Size/mmCover
Thickness/mm
Clear
Opening/mm
Overall Depth/mmIn-tray Depth/mm
MT-LightPro06/08/10300x3003~4240x24060/80/10050/70/90
400x4003~4340x34060/80/10050/70/90
500x5003~4440x44060/80/10050/70/90
600x6003~4540x54060/80/10050/70/90
700x7003~4640x64060/80/10050/70/90
800x8003~4740x74060/80/10050/70/90
900x9003~4840x84060/80/10050/70/90
1000x10003~4940x94060/80/10050/70/90

IMG_44411.jpg



Packaging & Shipping


1 - .jpg 





Company Information


about us.pngHTB1.jpgHTB1iXF2Xsfr.jpg 





FAQ


Q:Are you trading company or manufacturer ?


A:We are factory.


 


Q:How long is your delivery time?


A:Generally sample and mould need 15-20 days and after sample approved, the mass production need 20-30 days.


 


Q:Do you provide samples ? is it free or extra ?


A:Yes, we could offer the sample for free charge but do not pay the cost of freight.


 


Q:What is your terms of payment ?


A:Mould cost need 100% prepaid and mass production need 30% deposite, and the balance before the shipment.




1600171130902
0.0301 s.