Hot Sale TECON Aluminium Doka Slab Form construction formwork system aluminium formwork systemn for concrete

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description



TECON Aluminium Doka Slab Form concrete formwork system aluminium formwork system





Specification


NO.
Items
Data
1
Material
Aluminium 6061-T6
2
Weight
18kg/sqm
3
Max Panel Size
1.8*1.8m
4
Plwood
Birch
5
Slab thickness
Up to 700mm
6
Color
Customized 
7
Application
Slab structure
8
Prop
TECON TEP-B/D Prop



Features at a glance





--Large-area shuttering

High output with 1.8mx1.8m panels and other smaller size panels such as 1,8mx1,2m etc., no main beam and secondary beam required
--Easy and fast operations
Up to 180 square meters per day (8 hours) by two workers Quick and simple assembly due to minimal main components design, even no skilled worker required
--Early-strip system
Early stripping heads (drop heads) help to maximize the usage of aluminum panels, with themselves left in lower floor together with floor props
--Applicable with other formwork
Flexible solution to cover infill area around columns and beams with TECON Slab Flex 20 foimworic or conventional timber formwork by site
--Safety
Improved safety measurements via support and protection in the stmcture edge




Main Components




Slab flex20 system
1.H20 timber beam
2.Fork head
3.Foldable tripod
Alu-flex system
4.Alu-flex panel
5.Early stripe head
6.Truss bracing
Supporting system
7.TECON TEP-B prop
TECON TEP-D prop


Details of Early-strip


The four corners of the formwork panels will
create a 50*50mm gap after assembly, which
allows perfect match up of 100*100mm plate
on early-strip head.
The early-strip head has a 90mm drop height
via its slider.





Work status
Drop the early-strip head via hitting
the slider by hammer.





Strip status
Leave the props and early-strip heads in their place and transport formwork panels into the upper flfloor.


Working Status
Stripping Status




TECON-Form Birch ( Birch Plywood)
TECON-Form Birch (Birch core plywood) is consists of 7 layer sheets of birch veneer glued via phenolic WBP glue together with resin, it can be reused up to 40 times in our
ALUFLEX panels due to its excellent strength, water-proof glue & phenolic fifilm, and fully sealed frame.

The surface of the birch plywood is nearly free of gaps and other defects which gives it impact resistance, smooth surface, great screw holding power and can therefore be used for building,
construction.


Alu-flex Panel dimensionHead


Panels are made of 6061-T6, with 10mm birch plywood, powered coated in red.



Technical Specification
The follow table indicates deflection of different size panels under different slab thickness for your on-site guidance


Panel Size(m) /Deflection(mm)

Slab thickness (mm)

Load capacity (kN/sqm)

1.8x1.8
(4 pcs prop)

1.8x1.8
(5 pcs props)

1.8x1.2

1.8x0.9
150
4.9
5.05
/
/
/
200
6.6
6.8
/
/
/
250
8.3
8.55
1.9
/
/
300
9.945
/
2.36
3.5
1.9
350
11.603
/
2.75
4
2.3
400
13.26
/
3.15
4.6
2.6
450
14.918
/
3.54
5.2
2.9
500
16.575
/
3.9
5.8
3.3
550
18.23
/
4.3
/
3.6
600
19.89
/
4.7
/
3.9
650
21.55
/
5.1
/
4.3
700
23.21
/
5.5
/
4.6


To sum up, the allowable deformation of the table is 1.8/D.4=4.5mm;
1.8/0.3=6mm;1.2/D.4=3mm; 1.2/0.3=4mm; 0.9/0 4=2.25mm; 0.9/0.3=3mm
According to the customers requirement with floor thickness and deformation,
we can provide the design via different panels sizes


Our Service Process




Similar Products


Slab Flex 20
Slab Table Formwork
BASE 20 Formwork


HETO Frame Formwork
Alumi Frame
Alu-deck Slab Formwork


Plastic formwork TP60
Protection Screen
Shoring Tower ST60


Successful Projects




About Us


The leading formwork brand in China
TECON Formwork & Scaffolding Engineering.As the specialist in formwork & scaffolding engineering area, we provide reliable products & in-time services for our customers in construction industry all over the world.We have a wide range of products line which covers climbing formwork, wall formwork, slab formwork, column formwork, beam formwork, shoring towers and all kinds of scaffoldings.






Packing Method




FAQ


1. How to get a quotation?
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Phone: +86-512-65650586
Mobile: +86-13507532707
2. What is the payment term?
By T/T or L/C.
3. What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other system, the lead time is from 30 to 45 days.
For more accurate lead time, please contact us for specific product based on your quantity.
4. What is the package method?
We have standard steel pallet, wooden pallet etc. which suits to container transportation.
5. Do you have any guarantee on the quality?
We have guarantees on the quality on different product basis.
6. Do you offer buy back system or rental business?
We offer buy back system on some of medium and big scale projects, but we do not have any rental business yet.
7. Do you have on-site supervision service?
Yes, we have on-site supervision service for most of our projects across the world except for a few restriction regions.
8. What benefit we can get from TECON?
From TECON, you can get full range of advanced system with excellent quality, our know-how and in-time service. They will lead to increased productivity, labor saving and great cost down on your site as a result.
9. Are you looking for agent or distributor in our country?
Yes, we are looking for agent or distributor worldwide based on win-win relationship. If you have such experience, capability of investment, as well as business plan & goal, we’d be glad to discuss with you in details. TECON has its special agent and distributor policy waiting to support your success in formwork & scaffolding industry.
10. How to purchase your formwork and scaffolding?
For any order you proceed with TECON will basically follow below steps.
Step 01. Confirm the PI based on our proposal after technical & commercial communication – by Customer, TECON Overseas Sales team and Technical team
Step 02. Make the deposit – by Customer
Step 03. Report on production schedule weekly until completion – by TECON Customer Care team
Step 04. Execute pre-shipment inspection – by Customer or Third Party Inspection company
Step 05. Effect the balance payment – by Customer
Step 06. Arrange the loading and shipment after balance payment – by TECON Customer Care team
Step 07. Submit the full set of shipping documents via courier after departure – by TECON Customer Care team
Step 08. Submit the full set of user manual, calculation, shop drawing and assembly drawings – by TECON Overseas Sales team
Step 09. Site supervision – By TECON Site Supervision team



0.0145 s.