Aluminum Radiator Powder Coating plant (1600234550790)

Share on:


Price:$36,000.00 - $40,000.00
Price in USD:Details

Quantity:


Product Overview

Description





PRODUCT TYPE


How to design an optimal solution

1. Comprehensive analysis of customer cost budget and capacity requirements, select manual delivery mode;  
2. Delivery method: Manual
3. Comprehensive analysis of workpiece weight, size, shape and other factors, select the ground rail mode and design the optimal running length.



Products Feature


The main advantages of the Hanna conveyor system
1, Easy to assemble and disassemble
2, Maximum flexibility, allowing the creation of transport routes of different configurations
3, High quality production and assembly of each component
4, Excellent durability and reliability
5, Minimum maintenance requirements
6, Provides very flexible operation and simple management.
7, Easy to handle loading and unloading operations, provide solutions for cargo handling of any size and weight.


Application


storge rack , goods shelves ,
electrical control metal cabinets
aluminum door frame


Product Parameters


Equipment
Application
Pre-treatment System
Better powder coating of the work-piece.
Dip tank pretreatment
Spraying pretreatment
Powder Coating system
fast color change
Big cyclone + secondary filter recovery
Simple filter recovery
Conveyor Transport System
Manual conveyor
Fully automatic conveyor system
Curing Oven
It makes the powder attaching to the work-piece.
Tunnel oven, bridge oven, box oven .




Ordering Process




Packing&Shipping




Our Advantages




FAQ


Are you a trader or a factory?
We are manufacturer and exporter.
Our own factory was found in 1990,Our export office was established in 2014.
What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee, reasonably determines and divides the stages of design,
production, installation and commissioning, and formulates detailed progress plans for each stage,
Strengthen the quality assurance system and quality protection measures of equipment
manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment
maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the
customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the
device remotely through the computer network through the authorization given by the customer, and
eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.


1600234550790
0.1934 s.