Share on:
Item no.: | KRMD1129 |
Material: | zinc alloy, brass, stainless steel, iron |
Craft: | die casting, die struck, polished, plated, color filling, packaging |
Plated: | gold, silver, nickel, bronze, antique imitation, chrome, etc. |
Size: | custom, 2.5'' |
Colors: | soft enamel, hard enamel, printing, laser engraved, etched, pad printing, epoxy coating/dome |
Usage: | event trophy, gift, sourvenir |
Delivery: | 5-7 days for medal samples, 15-18 days for mass production |
Accessories: | laces, regular/thermal ribbons, strings, chains |
Customized: | yes |
Company type: | Alibaba onsite audited golden supplier: professional metal craft manufacturer. Our main products include medals, coins, badges, lapel pins, nameplates, belt buckles, keychians, bottle openers, dog tags etc. |
Our quality: | From medal designing, mold making, production to the shipping, we have strict QC standard. To make sure all the products are 100% qualified and safe. |
OEM/ODM: | welcome. |
Our services: | we have a professional team: common understanding, mutual respect, honest and passionate for the jobs. Usually, your inquiries will be replied within 2 hours. Due to time difference, we make sure that we reply you back within 10 hours at most. |
Our goal: | To be your best supplier in China |
Question:.How to proceed with my order?
Answer: After the prices, production time and delivery terms are confirmed, we will issue the PI for the sampling (mold fees). After receiving the sampling fees, we will draw the artwork for your reference. After your approval, we will open the mold and make the samples accordingly. We send physical samples via Express or send sample images via email for your approval.Only after your approval, shall we proceed with the mass production. Before the mass production, 30% down payment is required. 70% balance is required before the delivery.
For the repeat order, 30% down payment before the mass production and 70% balance before the shipment.
For long term partners, the payment terms may be negotiated.
Question: What’s the lead time for sampling and mass production?
Answer: Usually, it is 5-7 days for sampling and 15-18 days for mass production. The rush orders are accepted as well.
Question: Do you provide ODM/OEM services?
Answer: ODM/OEM is welcome. From concept to finished goods, we do all (design, tooling, and production) in our factory.
Question: Are you a manufacturer or trade company?
Where are you located? Answer: We are a direct manufacturer. We are located in Hexie Industrial Zone,
Xiegang Village, Xiegang Town, Dongguan City, Guangdong province, China.
Question: Warranty
Answer: 100% quality inspection before the shipment. Free replacement if clients get the item with defect.