Factory Direct Sell Computerized Tunnel Lining Formwork Tunneling Construction Equipment

Share on:


Price:$48,000.00
Price in USD:Details

Quantity:


Product Overview

Description



Product Description


High-efficiency dual casting
The dual casting system can be controlled by a remote control unit for layered casting of concrete into the mold window by window.
The time for secondary-lining of each ring is 8 to 10 hours.
High-frequency vibration for compactness
A high-frequency pneumatic vibrator enables high vibration frequency, wide vibration range and max. vibration depth up to 500mm, assuring concrete compactness.
High informationization
The formwork has functions as follow: display of liquid level, temperature monitoring of concrete into the mold, warning for filling-up as well as data recording, storage and transfer.
Manpower saving and material saving
Concrete distribution for the formwork can be made by only one operator.
Concrete pipelines are cleaned by high-pressure blow wash from sponge balls, which is easy to operate.
Lining for each ring can be made by 4 to 6 workers.



Items
Unit
CQS12
Total power
kW
90
Theoretic lining length (one operation cycle)
m
12
Theoretical lining concrete output
m³/h
40
Theoretical time for concrete casting of one ring
h
8
Required clear space W×H
m
3.9×4.5
Weight
kg
160000
Dimensions L×W×H
mm
12100×13400×9945(Formwork installation state)




Recommend Products












Company Profile










FAQ


1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC,
3: What about the delivery time?
A: 7-20 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs