Share on:
We making kinds of crate mould in different size,according to customer's requirement.Such as vegetable crate mould,fruit box mould,turnover box mould,beer crate mould,bottle case mould,etc
Your quotation will be replied in 24hours.
1.Mould Material Q/C
- Mould Steel Checking(Hardness, Crack ,Blow hole material defects )
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Machining Process Q/C
- Design checking (Part design, mould design,Including 2D drawing and 3D drawing)
- Each part of mould's size checking after machining according to 2D drawing
- Mold Test (check mould running conditions and T1 samples)
3.Make sure to follow and checking each points of customer's request before shipment
\t | \t | \t | \t | \t |
\t | \t | \t | \t | \t |
\t | \t | \t | \t | \t |
\t | \t | \t | \t | \t |
\t | \t | \t | \t | \t |
\t | \t | \t | \t | \t |
\t | \t | \t | \t | \t |
\t | \t | \t | \t |
\t | \t | \t | \t |
\t | \t | \t | \t |
\t | \t | \t | \t |
\t | \t | \t | \t |
\t | \t | \t | \t |
\t | \t | \t | \t |
1.From Ningbo by train 1 hour.
2.From Yiwu by bus 3 hours.
3.From Shanghai by train 4 hours.
4.From Guangzhou by air 2 hours.
1.Samples or data provided by customer;
2.Analyze the product sample or data, making 2D/3D drawing;
3.Setting up mould construction 2D/3D drawing confirmation;
4.Mould flow analyzing;
5.Mould design;
6.Mould making process;
7.Mould trial;
8.Mould test sample testing;
9.confirm with customer;
10.mould delivery;
bumper mould,auto lamp mould,automobile interior parts mould,grill mould,dashboard mould,etc
crate mould,pallet mould,baby bathtub mould,storage box mould,children slider mould,toys mould,chair&table mould,etc
auto lamp lens bi-color mould,auto parts bi-color mould,bowl bi-color mould,etc