Share on:
Material | Copper Alloy+LCP Plastic Material | Other material | Aluminum alloy 6061, 6063; Copper alloy C5191, C18400, C7025, CuSn6, etc., Stainless steel, Iron, etc. |
Surface Treatment | Plating | Mold lead time | 5 weeks |
Lead time | 7 Days per order | Mold lifetime | Min. 10,000,000 pcs |
Package | Reel+Carton | Punch | Automatic high-speed punch |
Mold-making Machines | We have Seibu and Sodick slow-feeding wire-cutting equipment, etc. |
Injection Machines | 24 sets, we both have horizontal and vertical injection machines. |
Stamping Machines | 25 sets, we have C type, and planer type punch. |