Modified Front Bumper Front Surround Front Lip Car Bumper lip rear part body kit For Hatchback Civic

Share on:


Price:$12.90 - $20.00
Price in USD:Details

Quantity:


Product Overview

Description






 




Product Description

































































Product name

car bumper mould/auto part mould

 Mould Base SD,LKM Standard, HASCO Standard Self-made, etc.
 Mould Material P20/718/738/NAK80/S136/2738/2316/H13, etc.
 Moud Precision +/-0.01mm
 Mould Life 50-500K shots
 Mould Cavity Single cavity, multi-cavity
 Runner System Hot runner and cold runner
 GateType Pinpoint Gate, Edge Gate, Sub Gate, Film Gate, Valve Gate,  Open Gate, etc.
 Equipment CNC,EDM,Cutting off Machine,plastic machinery,etc plastic  part  
 Plastic Material PA6,PA66, ASA, POM, PPS,  ABS,ABS+GF,ABS+PC,POM(Derlin),PP,  PE,PC,PMMA(Acrylic),PVC,PEI,PBT,PTFI 
 Metal Material  Aluminum (6061,6063,7075...),Brass, Copper,  Brass,Satinless Steel(301,302,303,304...)
 Surface Treatment Polishing,Painting,Chroming,Anodizing, Brushing, Silk  Screening,Water Transfering, Laser Cutting,Leather  Covering,Texture, Sanblasting,Gilding, UV Painting…
 Pls Provide 2D, 3D, samples, or the size of the multi-angle pictures
 Quanlity System ISO 9001: 2015
 We Promise   All customer-centric, never for short-term profit, and sell  long-term benefits

7--42._.jpg3..jpg4..jpg5..jpg


 


 


 






Company Information


6..jpg7.jpg7.jpg 






Cooperate With Compa


8..jpg 






Excellent Feedback


9..jpg10..jpg 






FAQ


Q1: Where is your factory?


A:We are located in Guangzhou China.( Airport IATA: CAN, ICAO: ZGGG;Seaport: NANSHA & HUANGPU)


Q2: Avaliable for customized design drawings?


A:Yes, DWG, DXF,DXW, IGES, STEP, PDF etc.


Q3: Will my drawing be safe after you get it?


A:Yes, we can sign the NDA before you send the drawing.


Q4: What s the MOQ?


A:In general 100 but can accept Small quantity in special conditions.


Q5: DO you provide samples?


A:Yes, just need sample cost, we will return it back in mass production.


Q6: What's the leading time?


A:It depends on quantity, Generally 3-15 days after order confirmation.


Q7: Can we know the production process without visiting the factory?


A:We will offer detailed production schedule and send weekly reports with digital pictures and videos which show the production progress.





 


 


 


 


 


 


 



0.0108 s.