CE approved Outdoor building site elevator passengers Materials lift construction personnel hoist lift (1904409814)

Share on:


Price:RUB 1,160,613.00 - RUB 6,808,929.60
Price in USD:Details

Quantity:


Product Overview

Description

500kg~3200kg Building site elevator materials lift construction personnel hoist lift as below:
  PLC Common type Building site elevator materials lift construction personnel hoist lift
  Low, medium, and high-speed VVF Building elevator materials lift construction personnel hoist lift
  Special purpose Electric Construction elevator, such as power plant cold water tower Building site elevator materials lift construction personnel hoist lift, mini rack construction lifts for tower crane, and mine construction lift PM Hoist..
  Inclined Outdoor Building site elevator materials lift construction personnel hoist lift
  Small rack observation Building site elevator materials lift construction personnel hoist lift
  High-level test bed maintenance Building site elevator materials lift construction personnel hoist 
  Other OEM type Building site elevator materials lift construction personnel hoist lift
VFD Control Building site elevator materials lift construction personnel hoist lift
Specification
Type 
Lifting Capacity
Lifting Speed
Motor Power
VFD
Safety Device


Single cage 
SC100L
1000Kg
   0~33m/min    0~40m/min
2×11Kw
30Kw
SAJ 30-1.2
SC150L
1500Kg
  0~36m/min    0~46m/min
2×13Kw 2×15Kw
   30Kw   37Kw
SAJ 40-1.2
SC200L
2000Kg
  0~40m/min    0~46m/min
2×15Kw 3×11Kw
37Kw
SAJ 40-1.2

Twin cages 
SC100/100L
1000Kg×2EA
  0~40m/min
2×11Kw×2
30kw
SAJ 30-1.2
SC150/150L
1500Kg×2EA
  0~36m/min    0~46m/min
2×13Kw×2
2×15Kw×2
30Kw
37Kw
SAJ 40-1.2
SC200/200L
2000Kg×2EA
  0~40m/min    0~46m/min
2×15Kw×2
2×11Kw×2
37Kw
SAJ 40-1.2
Product advantages

Materials lift construction passenger hoist: QUALITY COMES FIRST !

1. Building elevator construction passenger hoist lift Mast section: Welded by welding Robot ensures reliable quality and elegant appearance.
2. Building elevator construction passenger hoist lift steel structures: are processed with blasting technology to remove rust. The adhesion of surface painting is outstanding.
3. Building elevator construction passenger hoist lift Cage: Guarding board adopts figured aluminum plate and numerical control punched aluminum plate. The suspension cage is lightweight and artistic in appearance.
4. Building elevator construction passenger hoist lift Transmission mechanism: supplied by the professional manufacturer has high efficiency, long service life and stability in performance.
5. Building elevator construction passenger hoist lift safety measures: overload protection devices, variety of limiters and mechanical chain devices ensure its reliability. Anti-falling safety device, which restricts the excessive downward movement of the cage, preventing and eliminating accidents.
6. Frequency Inverter Building elevator construction passenger hoist lift is safe, stable and comfortable. Starting electricity is smaller than working electricity, energy-saving and high efficient.

A. High security and good quality steel structure of Building elevator construction passenger hoist lift

When the building construction lift facade lift moves too fast, or over the limit speed, the safety device will start to work and cut main power of passenger cum Material Hoist

The limit switch will make the building construction lift facade lift when it moves to the top and bottom of the mast sections.

①The rack’s raw material adopts LG60 steel, and the general error within 0.2mm is more accurate .

②The mast section stulls are change to U-shape structure refers to the Alimak Hek technology, and they can be more solid than domestic general types.

B. Good quality driving mechanism of Building elevator construction passenger hoist lift

B. High performance electric parts and components of Building elevator construction passenger hoist lift

The building construction lift facade lift overload alarm apparatus.

The building construction lift facade lift Operation board with Standby lamp

There is PLC system for construction hoist without VFD. All electric components is Schneider brand, and use Taiwan start and stop delay PLC. It keeps the construction hoist running smoothly when starting and breaking.


The construction hoist with Frequency inverter, the inverter brand can be Siemens/Schneider/Yaskawa/Toshiba or Chinese brand, High quality and steady performance keep long service life.

Manufacturing

Workshops and production line of Building elevator construction passenger hoist lift

5S International management for Workshops.
Our company have 10+ years of manufacturing experiences, we adopt 5S workshops management. Keep everything in order to avoid mistakes and work out in principle. In busy time, it can lead to a efficient, correct work! With the innovation of Electric Construction elevator technology , and the development of the advanced equipment, the workshop becomes the industrial model factory of Construction lift, construction elevator, Building elevator construction passenger hoist lift, passenger hoist, small hoist.

Product packaging

Packaging & Shipping

Building elevator construction passenger hoist lift for buildings site is the most important matter, but we can not ignore the importance of package. Well package can protect the product from crash, rust ,mess and so on. It is easy for our clients to identify different spare parts, easy loading and unloading. We pay much more attention to the details...Every step before orders and after order confirming is important !

Customers Relationship
Certifications
Company Profile
XINGDOU,Vertical access Building elevator construction passenger hoist lift manufuring & OEM Solution Specialist !

We Are An "A" Level Manufacturer and Supplier of Materials lift construction passenger hoist lift!

With ISO&CE&COC &TUV&BV Certificate
Have exported for more than 50 countries
Have exported rate upto more than 40%
Have 3 Hi-tech factories and 6 production lines
Have the best engineer and equipment in China
The Building elevator Materials lift construction passenger hoist lift Annual production up to 1000 sets

FAQ
To know us better check below plz !
Quotation request:
If you are interested in our Building elevator construction passenger hoist lift, please provide the following parameters:
1) Lift height (m)
2) Load capacity (ton)
3) Double cage or single cage
4) Mast tower coat: Painting spray or hot galvanized?
5) Using temprature?
6) Local power supply (V, Hz)
7) Is there any space limited for your construction site? If yes, give us a brief drawing to show the space plz
8) Other special equipments
9) FOB or CIF price? If CIF , plz let us know your destination port.

We will provide best price once confirmed the above. You can get our feedback within 12 hours !

1904409814
0.0127 s.