Newest Stainless Steel Cryogenic CFL-20/0.6 Methane Gas Tank

Share on:


Price:RUB 94,291.20 - RUB 2,750,160.00
Price in USD:Details

Quantity:

Add to Cart

Product Overview

Description

Methane Gas Tank Supplied by Shanghai Eternal Faith Industry Co.,LTD.

Product Description

Methane Gas Tank Description:

1.Water Capacity:20m3
2.WP:0.6MPa
3.Dimension(mm):Dia2600xL6260
4.Certification:BV/SGS/TUV 

Methane Gas Tank Specificaiton:

LNG Tank Specification

Model Number

CFL-20/0.6

Water Capacity

20m3

Working Pressure

0.6Mpa

Overall Dimension

Dia2600mmxL6260mm

Empty Weight

10675kg

Designed Working Life

20Years

Place of Origin

Shanghai, China(Mainland)

After-sale Service

Overseas Third-party Support Available

Delivery Time

90Days

Certification Provided

BV/SGS/TUV

Brand Name

SEFIC

 

Methane Gas Tank Diagram:

HTB133

 

Methane Gas Tank Pictures:

Cryogenic Storage Tank-26

VerticalTank-1

 

Methane Gas Tank Details:

Cryogenic Storage Gas Tank Details-1

 

Gas Tank Production Process:

Tank Production Process

1

Cutting Materials

2

Rolling Machines for Circling

3

Welding and NDT Inspection

4

Re-circling after Welding

5                     

Outer Vessel’s Abrasive Blasting and
Anti-corrosive Painting for Outside Surface

6

Pipe Connecting and Assembly of Inner Vessel and Outer Vessel

7

Valves Installation

8

Perlite Filling

9

Vacuum-Pumping

10

Final Painting and Ready for Shipment

LPG Tank Production Process.jpg

 

Gas Tank Certification:

SEFIC PED Certification-1

Certificate Docs

Following Documents will be provided with the tank:

(1) Certificate of Supervision and Inspection;

(2) Copy of Nameplate;

(3) Certificate of product quality;

(4) Product Certificate;

(5) Product Data Sheet;

Welding Record

Records of Material Using

List of Materials for Main Pressure Parts

List of Materials for Main Pressure Parts

Material List

Quality Certificate of Main Pressure Parts

Mechanical Properties for Pest Plates

Pressure Test Report

Appearance and Geometric Dimension

Check Report for Vessel

Welding RT Report

Weld Ultrasonic Test Report

Penetration Test Report

Penetration Rate Test Report

Cleaning Inspection Report

Heat Treatment Report

Pressure Strengthening Test Report

Oxygen Content Test Report

Helium Test Report

Vacuum Inspection Report

Velocity of the Leakage and Deflation 

in Normal Temperature Test Report

Calculation Sheet Respectively

Valves Instrument and Safe Device List

Risk Assess Report

As-built Drawing

Packaging & Shipping

Cryogenic Gas Storage Tank Loading and Transporting:

Cryogenic Tank Loading and Transporting-1.jpg

 

Company Information

Logo-2

Creative and Trustworthy Company:

1. Located  in Shanghai, SEFIC is one of  professional suppliers of gas storage tanks and affiliated equipment parts.

2.Our products have been exported to many countries such as U.S.A. and European countries and enjoy popularity all over the world.

Quality and Security System:

3. We have implemented strict complete quality and security control system, which ensures that each product can meet the quality and security requirement of our customers.

4. We have been adopting the advanced science and technology to produce gas tanks and affiliated equipment since our company is established.

We Are Reliable Partners!

5. We have been making great effort to achieve this win-win project and sincerely hope we will have long-term partnership in the soon future!

6.All clients are welcome to our company for visit!  Company Website: http://sefindustry.en.alibaba.com

 

Our Team Construction:

Company Activities-2.jpg

Our Services

1. MANUFACTURE

Advantages: Having many years experience in mechanical manufacture. Being equipped with advanced processing equipment. Possessing excellent senior technicians with professional training.
Quality Control: We have independent QC departments both in the company and factories which strictly control the quality of each process to enable our production lines to reach Chinese National Standards, even International Standards.
2. INSPECTION

Inspected by the Sellers: After completing the manufacturing and assembling of the equipment, we will test the machines and commissioning in the workshop.
Inspected by the Buyers: After confirmation of a sound work of the line, we will invite our customer to send their representatives to inspect the production lines in our factories.
If necessary, we could request an international inspection organization to make further inspection.

3. INSTALLATION AND COMMISSION
Our company has plenty of excellent technicians who have experienced many big projects abroad, and achieved success. Therefore, from the foundation to commissioning, they are competent to instruct the customers how to construct the foundation and build the workshop, and to associate them to complete the work of installation and commissioning.

4. AFTER SALE SERVICE

Technical Support Fully providing technology supports both within and after the warranty period. Feeding back to our customers at first time.
Spare Parts: Promptly providing spare parts and wearing parts.
Upgrade Improvement of technology and equipment.

 

Clients come to our company to have a meeting about gas tank products and affiliated equipment.

Our Service-11.jpg

 

Clients Feedbacks:

Our Service.jpg

More Information

Q1:What is the delivery time of this gas storage tank?

A1:The delivery time of gas storage tank is usually within 90 days once the deposit received and product drawing confirmed

 

Q2:What is your production standard? Can you manufacture your products under ASME standard?

A2:Our products are designed, manufactured and tested as per reference standards of GB150, safety technology supervision regulations of pressure vessels and some other reference Chinese standards.

Our company has obtained the A2 and C2, C3 Pressure Vessel Fabrication Certificates, Grade GC1 Pressure Pipe & Vessel Construction Certificates, ISO9001 Quality Certificate, ASME Certificate. If you ask for ASME stamp, we are able to manufacture your products under ASME standard.

 

Q3:What’s the warranty for the storage tanks?

A3:Our warranty is one year after shipment. Within one year, we will send broken spare parts at our expense upon request if it is proved to be our production defect. In fact, we rarely receive any spare parts request. If the tanks are maintained properly, they can be used for 15-20 years.

Contact Us

Logo-5.jpg

Please feel free to contact us if further information is needed. We are ready to answer your any question about our products.

 

Best regards!

 

We Recommend

0.0025 s.