Cordless 1100W warm tray electric buffet Food warming plate (60424112085)

Share on:


Price:$13.50
Price in USD:Details

Quantity:


Product Overview

Description


Cordless 1100W warm tray electric buffet Food warming plate


.jpg



Product Description

ES-4001.jpg














































 


 


 


 


 


 


 


 


 


ES-4001




 


 


 


 


 


 


 


Input voltage

220V-240V~50Hz / 110V-120V~60Hz



Power consumption



110W



Product size



46.7*20*5.8 cm



Carton size



512*342*250 cm



Pieces per carton



4 pcs



Warranty



2 Years



Color



S/S



keyword



Food warming plate



name



Cordless 1100W warm tray electric buffet Food warming plate



1/Stainless Steel Top plate dia.:400*200mm
2/Pre-heat time: Max. 6 mins
3/Detachable Power cord: Exposed length (with plug): 100cm , Type: H05RR-F 3G 0.75mm2
4/With power (red) and ready (green) indication light
5/With on/off rocker switch
6/With aluminum handle
7/Stainless steel application at front
8/With 4pcs anti-slip feet



 



Recommended Products




















Company Information


 .jpgAbout Eastar Group: Eastar Group has specialised & focused in Home Kitchen Appliance since 2005, owning its own R&D,


Manufacturing and Sales deparments, and Three Professional Factories which pass BSCI Audit:


Factory One: Specialised in Kitchen Heating items, such like Hotplate, Recllete & Infrared grill, Ceramic stove, Food warming plate etc.


Factory Two: Specialised in high quality Multi-Function items, such like Eastar cooker, Air Fryer etc.


Factory Three: Specialised in Motor items, such like Popcorn Maker, Ice-Cream Maker, Coffee Grinder, Slicer etc.





company information


 





FAQ


Q1.Which certification do you have?


A1.We have the certification are the following:CE/GS/CB/ETL/ERP/ROHS/REACH/LFGB.


 


Q2.What are your main products?


A2.Our main products are Hot plate, Ceramic stove,Food warming plate,Raclette grill,infrared grill,Multi cooker etc.


 


Q3.Are you a manufacturer or a trading company?


A3.We are a manufacturer own 3 Professional Factories.


 


Q4.How many days for prepare sample ?


A4.3-7days


 


Q5. How many days for mass production?


A7. 35-50 days





Back to home



 


60424112085
0.0121 s.