GMP ISO Class Pharmaceutical Modular Clean Room Project

Share on:


Price:RUB 758,344.00
Price in USD:Details

Quantity:

Add to Cart
  • add to wishlist

Product Overview

Description

 (1)

Main feature

  • 40 years' experience, 2000-2500 cases, over 10 countries;
  • Turnkey service: design, manufacturing, construction, commission, training and after-sale service;
  • GMP standard: class 100-100000, ISO 5-8, Class B-D;
  • Customized: solid dosage, IV solution etc;
  • High efficiency: design: 20 days; production: 20-40 days; construction: 60-90 days.
Application
Pharmaceutical
Lab
Electronics
Cleanliness
Class 100 to 100000
ISO 5 to 8
EU B to D
Scope
Structure part:
Partition and ceiling panel;
door and window, epoxy.
HVAC part:
AHU and chiller;
Ducting and piping.
Electrical part:
Lamp, switch and socket;
Distribution cabinet.
Service
Design and production
Construction and test
Validation and training

 

Hot Product

 

 

 (2)

.jpg

Overseas Project List.png

 (4)

Q:Where have you exported your equipment?
A:We’ve already exported to more than 30 countries in Aisa,Europe,Middle East,Africa,South America.etc.


Q:Can you arrange the visit to your user?Can you customized the machine according to our requirements?
A:Yes,Of course!


Q:Is your equipment in accordance with GMP,FDA,WHO?
A:Yes,we will design and manufacture the equipment according to the requirement of GMP/FDA/WHO in your company.


Q:How about your after sale service?
A:We will reply you within 24hours by email or phone.
If we have local agent,we will arrange him to your site within 24 hours to assist you to shoot the problem.


Q:How about the staff training?
A:Normally,we will train your staffs during the installation in your site,you are also welcome to send your staff train in our factory.


Q:How long will the turnkey project take?
A:About 1 year from designing the layout to finish installation and commissioning.


Q:Which kind of after-sales service you can offer?
A:Except the regular service ,we can also provide you know-how transfer,and dispatch our qualified engineers to help you run the factory up to 6-12 months.

0.014 s.