Share on:
tiger rig hot selling ZJ90DBS ZJ70DBS ZJ50DBS Drilling rig for sale
Major features for drilling rig used for well :
Adopts integrated design of mechanical, electrical, hydraulic, pneumatic and digital control, utilizes fully the advantages of advanced digital control AC VF electric transmission, and simplifies its mechanical structure.
As adopting of slingshot type substructure, drill floor equipments and driller cabin etc realize low-position installation and integer lifting.
Electric transmission adopts vector VF drive system to realize all digital operation and control, and also processes elementary functions of automation, intelligence and information to realize collection (signal), display, restoration, printing, remote monitoring and management of control and drilling parameters.
By the use of VF technology, DW realizes max torque output when its speed is zero to ensure the suspension function of rig lifting system, which change traditional driller operation mode completely.
This drilling rig used for well is equipped with an integral driller's cabin, in which a driller can finish major operations.
Model | ZJ30DBS | ZJ40DBS | ZJ50DBS | ZJ70DBS | ZJ90DBS | ||
Nominal depth | 114mm(4 1/2 in.) DP | 1600~3000 | 2500~4000 | 3500~5000 | 4500~7000 | 6000~9000 | |
127mm(5 in.) DP | 1500~2500 | 2000~3200 | 2800~4500 | 4000~6000 | 5000~8000 | ||
Max. load of drilling string | 1700 (382) | 2250 (496) | 3150 (695) | 4500 (992) | 6750(1518) | ||
Max. line number strung | 5×6 | 5×6 | 6×7 | 6×7 | 7×8 | ||
Dia. of drilling line mm (in) | 29 (1 1/8) | 32 (1 1/4) | 35 (1 3/8) | 38 (1 1/2) | 42 (1 3/4) | ||
Dia of traveling sheave mm (in) | 1005 (40) | 1120 (44) | 1270 (50) | 1524 (60) | 1524 (60) | ||
Center pipe dia. of swivel mm (in) | 75 (3) | 75 (3) | 75 (3) | 75 (3) | 75 (3) | ||
Rated input power of DW kW (hp) | 550 (750) | 735(1000) | 1000(1340) | 1470 (2000) | 2210(3000) | ||
Shifting number of DW | Stepless change | Stepless change | Stepless change | Stepless change | Stepless change | ||
Type of main brake | Disk/Band | Disk/Band | Disk/Band | Disk/Band | Disk/Band | ||
Type of auxiliary brake | E.T. N ddy/Eaton | E.T. N dy/Eaton | E.T. N Eddy/Eaton | E.T. N Eddy/Eaton | E.T. N Eddy/Eaton | ||
Opening of RT mm (in) | 520.7 (20 1/2) | 698.5 (27 1/2) | 698.5 (27 1/2) | 952.5 (371/2) | 952.5 (37 1/2) | 1257.3 (49 1/2) | |
Shifting number of RT | 2 Step less change | 2 Step less change | 2 Step less change | 2 Step less change | 2 Step less change | 2 Step less change | |
Power per MP kW (hp) | 735 (1000) | 956 (1300) | 956 (1300) | 1180 (1600) | 1180 (1600) | 1640 (2200) | |
Number of MP | 1 | 2 | 2 | 2, 3 | 3 | ||
Mast effective height m (ft) | 41 (134) | 43 (142) | 45 (147) | 45 (147) | 46 (152) | ||
Drill floor height m (ft) | 6 (19.7), | 7.5 (25) | 9 (30), 10.5 (35) | 9 (30), 10.5 (35) | 12 (40) | ||
Drill floor clearance m (ft) | 4.7 (15.6), | 6.26 (20.5) | 7.62 (25), 9.12 (30) | 7.62 (25), 9.12 (30) | 10(33.33) | ||
Noted-- AC VF drive Drilling Rig |
Our factory covered 80,000 square meters, have 300 workers.Headquartered in the energy capital of the China, Chengdu city, Sichuan, Tiger rig designs, manufactures, and markets various kinds of oilfield equipment including drilling equipment, production equipment, well service equipment .Our equipment meets the rigorous industry standards established by the American Petroleum Institute( API) and the International Standards Organization(ISO).Please visit our website to get more information about our company and products.
We understand the needs of the operators and drilling contactors around the world. High quality, Competitive prices, and fast delivery are our top priorities.
Our Workshop
drilling rig used for well Packing:
1.The goods will be covered with plastic or other rainproof coat.
2.The packing of goods, which should be delivered to destination in accordance with the agreement we signed, will be offered by our company. And we will be held responsible for the consequences if damage of the product or loss of accessories occurs by the time the goods have shipped to port of destination.
drilling rig used for well Delivery time:
1. Warehouse drilling rig: 30 days after 30% payment.
2. booked drilling rig : 90-180days after 30% payment.
Welcome oversea rig manufacturer to cooperate with us.
Tiger Agent Requirements:
1.over 30 years old;
2.having the capital background in the local place;
3.having the working experience on the oilfield,such as oil technician,oil exploit,oil sales etc,and the one who has customer resources,is prior;
4.working near the oil field,thus convenient to visit customers;
5.capacity of English communication;