Share on:
ABS plastic Portable Touch switch Folding and Dimmable Led Desk Lamp with USB Charge built in battery
Protable led table lamp Sample order policy:
1. Sample fee depends on the quantity you want,normally free;
2.Sample delivery:1-3 days once confirmend;
3.Customized samples,cost depends on your art wotk;
4. 7-15 days for pri-production smaple;
5.Delivery by EMS,UPS,FedEX,TNT or DHL with track number.
6.Paid by western union,paypal,T/T.
Protable led table lamp Mass order Policy:
1.Delivery time ususlly around 25 days,after comfimation of downpayment.
2.Delivery port from ningbo,shenzhen china
3.Paid by 30% T/T deposit,70% T/T before shipment or against B/L.
4.Other Payment by L/C,DA,DP,western union,Paypal.
Protable led table lamp Package includes:
1 * LED reading lamp
1 * USB charging cable (not included adapter)
1 * User Manual
All products are certified with CE,ROHS and FCC
![]() | ![]() | ![]() |
other choice
![]() | ![]() | ![]() | ![]() |
Q1. Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. What about the lead time?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
Q3. Do you have any MOQ limit for led light order?
A: Low MOQ, 1pc for sample checking is available
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days to arrive. Airline and sea shipping also optional.
Q5. How to proceed an order for led light?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.
Q6. Is it OK to print my logo on led light product?
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.
Q: What is your payment term?
A: T/T, 30% as deposit, balance against the B/L copy within 25-30 days after departure from port.