Cadweld powder for exothermic welding (60767032710)

Share on:


Price:RUB 1.57
Price in USD:Details

Quantity:


Product Overview

Description

 

111.png

 .jpg

Product Parameters 
ConductivityLower than that of same length base metal
StrengthThe joint strength is not less than 95% of low limit of raw material’s strength (CCS material is regarded as pure copper )
Melting point≥1 083 
SurfaceNo air hole ,residue or crack

 

 

Main ElementRatio Wt/%
Cu≥76.0
Al≤2.0
Fe≤10.0
 othersabout 10%

 

 

Operation Instruction                   

l  Check to ensure the graphite mold and conductor is clean ,no residue before making the connection

l  Use a propane torch to dry wire conductors and remove remaining cleaning residue, solvent, or water before making the connection.

l  Close the graphite mold lid before ignition ,and close the lid tightly

l  Insert the conductors and position them for the connection.Ensure them in the center of cavity.

l  Keep the irrelevant personnel 1.5M away when welding

l  Keep the inflammable goods 1-2M away when welding

l  The operator must be equipped thermal barrier glove

l  Don’t face to the mould opening when welding

l  The operator keep 1.5M away mould is must after ignition

l  Don’t touch the mould and connected parts directly after welding

l  Open the mould and take the joint out with wrench 10-20S later after reaction .

l  Insulate the joint after the conductor cooling completely .

IMG_0291.JPG

 QQ20160730180851.jpg

 

exothermic welding.jpg

 

TB2lzhmchXlpuFjSsphXXbJOXXa_!!2076791091.jpg

 

1_08.jpg

1_10.jpg

1_16.jpg

1_17.jpg

Why Chooes Us 

1_19.jpg

Transaction Flow 

1_21.jpg

FAQ 
QuestionAnswer
1. Are you factory or trader?We are professional manufacturing factory
2. How to order?

Normally the customer can order our products by Alibaba platform or contact our representative by Email.
After receving your message, our sales will confirm with you about the specification or other required
details then we will send an official invoice to you via mail, which will be included the details of your
order and bank information stamp and signed by manager.

3. Do you accept OEM manufacture?

Yes.

4. What's your lead time?

Generally,the lead time is about 20 days after getting your down payment,the real time depends on your
order condition.

5. what's your payment Term? 

Generally, 30% down payment and the remained should be effected before shipping.

6.Where is your nearest port?

Ningbo or shanghai, both of them are about 3 hours ride.

60767032710
0.0157 s.