SB Brace Frame horizontal heavy-duty brackets single-sided wall formwork for excavation pit earth work

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description



Product Description


_01


ZULIN heavy-duty Single-side Bracket


 


-2.JPG


 


 


Introduction


 


Single-side bracket is a kind of formwork for the concrete pouring of single-side wall. The construction is easy and fast. The components have good standard performance and versatility. The pouring height is adjustable, the maximum height of a single pouring is 8.9m.


 


The formwork is always used in the concrete pouring of basement, subway, sewage treatment factory, culvert, retaining wall and so on. The finished wall is excellent and absolutely waterproof.


 


Structure Sketch


 


construction formwork.jpg


 


 


 


Anchor System


 wall-formwork.jpg


 


 


 


Parameters


 




























PARAMETERS
TypeSingle-side Bracket
Material Steel, Timber Beam H20
Height 3.6 ~8.9 meters
Through-wall Tie Rod Needn't
 Fixation of FormworkAnchor System, Adjusting Seat

 


 


 





Completed Projects



 -completed-projects.jpg


 _16 





Business Process


 


_12 





Related Products


                                      related-products_01.jpg


related-products.jpg


Click the picture above to learn more ZULIN products.


 


 


 


 





Company Profile



 


Beijing Zulin Formwork & Scaffolding Co.,Ltd is a leading company which develops, designs, manufactures, sells, and leases Formworks and Scaffoldings for construction projects in the field of civil and industrial engineering, roads and bridges, hydroelectric dams, nuclear power stations etc.


 


We are one of the pioneer companies which developed formwork and scaffolding in China. We have a team of dedicated and professional technical specialists which continuously improves our products offerings. The company have 2 excellent wooden beam production lines and 6 steel structure workshops.


 


With years of experiences in conducting our own research and development, we have gained recognition both in China and abroad based on our excellent techniques in this industry. We have won many intellectual properties, e.g. hydraulic auto-climbing formwork, Auto-climbing Protection Panel and many other types of formwork techniques.


 


We are constantly innovating in order to provide high quality products to our clients. As a result, we have received numerous compliments from our clients.


 


Beijing Zulin Formwork & Scaffolding Co.,Ltd is committed to our mission of striving for excellence and providing high quality products.We are dedicated to provide forward-moving technology, excellent products and services to both our existing and new clients.                               


                                                                                                                                                 MORE+


 -_02 





FAQ


_20


Q1. What do you do?


 


A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.


 


Q2. How many construction projects have you accomplished?


A: 600 both in China and abroad.


 


Q3. Have you accomplished any landmark?


A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.


 


Q4. What can you do for us?


A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.


B.We sell our products to the contractors, building companies, or trading companies


C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.


D.We provide remote or on-site instruction to the builders.


 


Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?


A: Structural drawing and section drawing.


 


Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?


A: In general, it takes 5~7 days based on specific requirements of construction project.


 


Q7. How long dose it take to manufacture the products after the signing of contract?


A: In general, it takes 30~60 days based on the type and quantity of products to be produced.


 


Q8. Are your products available for leasing?


A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.


 


 


 





Contact us


_22














0.0097 s.