Custom nonstandard D type marine dock fenders rubber dock bumpers damper for boats

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description



Custom molded RUBBER & PLASTIC &PU parts


Product Description


Product info




Material
Plastic, Rubber, Thermoplastic Elastomer(TPE), Metal and other Hybrid materials as per request 
Size
As per customers' requirment
Color
Any color or according to Pantone colors

Service
OEM or ODM
Samples
1-2pcs of free samples are available
Production basis
Product drawing, 3D files or exsiting samples
Process Technic
Injection molding, CNC machining, extrusion, casting, etc.
Injection molding, CNC machining, compression molding, extrusion, casting, stamping, etc.
Tolerance
±0.05mm
Lead Time
7-15 days for molding, 10-15days for mass production
Application
Automotive, Mechanical equipment, Construction, Home application, Aviation, Office facilities, etc.
Shipping & Payment
Packaging
Ziplock bag or bubble film plus cardboard boxes with wooden pallets outside
Shipping Method
Sea, Air, DHL, TNT, Fedex, UPS, etc.
Payment Terms
Trade assurance, T/T, L/C, Western Union



Custom Rubber Damper

We are a rubber molding factory, we will produce rubber damper based on your requirement size and shape.






Manufacturing Capabilities


Mold & Part Design
Mold Production
Injection Molding


Compression Molding
CNC Machining
Cast Molding


Surface Treatment
Assembly Service
Custom Package


Available Materials


Following shows some of our general molding materials. Material modification service is also available!Welcome to consult us!
Learn more→


Rubber Material

  • NR (Natural Rubber)
  • NBR/Buna-n (Nitrile Rubber)
  • CR (Neoprene)
  • EPDM
  • MVQ/Silicone
  • FKM (Fluorelatomer)
  • IR/IIR
  • BR/SBR
  • PU (Polyurethane)
  • TPE
  • TPV
  • TPU


Plastic Material

  • PA6 PA66 PA6+GF PA66+GF
  • ABS, AS
  • POM
  • PP
  • PE, LDPE, HDPE, UHMWPE
  • PTFE
  • PVC
  • PC, PMMA
  • PEEK
  • PS, PPS
  • PET, PBT
  • TPU, TPE




Production Process


Mold Making
Mold Polishing
Mold Assembling


Bulk Production

Product Checking
Packaging


Company Profile


Custom molded RUBBER & PLASTIC & PU parts





Packing & Delivery




FAQ


Q1.  Are you manufacture or trade company?
A: We are manufacture.

Q2.  What kind of payment do you accept?
A: Trade assurance, T/T, L/C, Weston Union are all accepted.

Q3. What is normal lead time?

A: Average 15-25days for tooling, bulk orders should be depends on quantity.

Q4. What is your standard package?

A: In general we use ziplock bag or bubble film plus cardboard boxes, wooden pallets or wooden cased will be used if necessary. Special packing method is available if needed.

Q5. What is the working life of the mould?
A: It depends on the parts we made. Besides, we will maintain or replace the mould by ourselves.

Q6. How many employees do you have?

A: We have 150 employees for factory, 45 employees for sales, 16 employees for technical support.



BACK TO HOMEPAGE


0.1012 s.