Product DescriptionSemi-Auto Pouch Cell Production Three-In-One Machine for Edge Ironing Trimming and Folding
TMAX300HH is a three-in-one machine provides the continuous workflow for edge trimming, folding and ironing of extra large pouch cell cases without dedicated labor. This process is widely used in the final steps of pouch cell battery pilot-scale production line to ensure a smooth, neat and tidy casing edge.
Ironing Module | |
Trimming Module | |
Folding Module | |
Max. Power Consumption | 2.5KW |
Working Voltage | 208-240 VAC, single phase |
Compress Air Pressure | · 0.7 - 0.8 MPa (Each stroke will consume 0.09L air ) · Note:Air Compressor is not included. |
Size Info (Edge Ironing, Trimming & Folding Width/Length) | · Cell length: 10~580mm · Cell width: 10~240mm · Cell thickness: 2~12mm |
Temperature Info | Ironing Temperature: 0-250℃ adjustable |
Dwell Time | 0-99 seconds adjustable |
Productivity | 160~220 pcs / hr (Expected lifespan of Trimming blade ~ 1 million times) |
Trimming accuracy | +/-0.1mm |
Working Modes | · Continuous workflow for edge trimming, folding and ironing of extra large pouch cell cases (manual cases loading is needed) · Linear sliding rail for easy manipulation of trimming, folding and ironing modules.
|
How to use this Tool | When the pouch cell is fabricated, an uneven edging excess is expected. In order to make a neat and tidy cell with smooth edge just like the commercial pouch batteries, please follow the steps in below: Step 1. The trimming module will cut off the excess area of the casing edge, only leave the size appropriate for the edge folding and ironing Step 2. The ironing module will smooth the edge prior to the folding Step 3. The folding module will partially fold the edge Step 4. The ironing module will smooth the folded section again and then iron the longer section against the sides of the case. Now a neat and tidy cell is finished.
|
Product Dimensions | L1950X W850 X H1800 mm |
Net Weight | 350Kg |
Warranty | Two Years limited warranty with lifetime support. |
Our Company & Team
CertificationsCERTIFICATE
Strength Proof
All our products are passed the inspection standards included SGS, CE, ASTM with 100% quality.
Cooperative Partner
Packaging & ShippingPACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.
FAQAbout Product1.Which procedure to secure your Quality?
Our company has own research & development and production base, the products have been calibrate by central laboratory professionals before before they leaves the factory, ensure the accuracy of test results and authority.2.How about your company product after-sales service system?Product after-sale guarantee period is 12 months.We have agents in some countries,they can provide door-to-door service.If there is no agent,our professional pre-sales and after-sales department can reply you within 24 hours for any technical problems.3.Products standards?Our instruments adopts ISO, ASTM, DIN, EN, GB, BS, JIS, ANSI, UL, TAPPI, AATCC, IEC, VDE and other international testing standards.4.Our country's power supply and plug are different, how do you solve it?We can according to different countries and the power plug, equipped with transformer and plug that in accordance with your local requirement.5.Payment methods?T/T, L/C, D/P and so on6.Packing method?Standard export wooden box packaging7.How about customers evaluation for your products?Our company has established long-term cooperation with the SGS, Bureau Veritas, TUV and Intertek.8.Main export market?Now our products have been exported to North America, Europe, southeast Asia, South America and other countries.10.How to ensure the customer standard use the instrument?We can provide each product related video showing how to install and operate.If you have specific needs, we also can arrange engineer to the customer's company for equipment operation training.About Shipping1.Order processing?
Please allow a processing time of 12-24 hours for your order(s) to ship. Equipment orders will take up to 2 weeks before leaving our warehouse. (Order processing is done during normal weekdays only)2. Shipping methods?1 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.2 Responsible for the damage during the shipping process, will change the damage part for you for free.3.Order tracking?Online order can be tracked by login to your account. Please allow 24 hours after order is shipped to see logging details.If you need a tracking number for your order, please send an email to us with your order/invoice number.4. Import/export tax, duty, GSM, Customs Clearance, and etc?All import/export related expenses are sole responsibility of the buyer; charges will vary from country to country. Please consult with your local import experts or transportation carrier for more details.5.Lost or Stolen packages?Please report all lost or stolen packages to us at the earliest possible time. An investigation will be open soon after reporting the incident to us, and a final ruling will be issued by the carrier for the claim after 10-15 business days. A replacement package will be sent as soon as the claim is accepted by the responsible carrier.
60816834258