Q1: Usage?
Our yarn mainly used on carpet machines, such as Wilton, Axminster, tufting and Hand-tufting machines.
Q2: MOQ?
2000 Square Meter
Q3: How long can you finish the production?
3weeks-5weeks after received the 30% deposit or L/C original. if need dyed yarn maybe need more time to modify the colors.
Q4: What is your payment terms?
FOB Qingdao, CFR or CIF.
30% deposit, 70%pay before delivery (we will share with you photos of products for you to check). Or L/C at sight.
Q5. Port of Loading: Port Qingdao, you would cover the extra costs if load from other Chinese Ports.