Vietnam Suppliers And Manufacturers Livestock Animal Hay Feeder For Sheep & Goat/ V Bottom Feeder

Share on:


Price:RUB 2,573.10
Price in USD:Details

Quantity:


Product Overview

Description

Product Description

Galvanized Heavy-Duty Cattle Panel


Product lifetime: More than 20 years.

Surface Treatment: The zinc and chromate layer is thick and resistant to corrosion and able to protect the inner layer for a longer period.

Chinh Dai Company's Galvanized Steel Pipes Products are manufactured based on Japanese, Korean and Chinese billets. Zinc raw materials are imported from Australia, Korea, and Brazil. The surface is specially treated with a chemical protective layer imported from India so that the products have these following outstanding characteristics:
- The surface is shiny and beautifully patterned.
- High durability and perfect pressure resistance thanks to the thick Zinc layer (Z12 – Z18), increased corrosion resistance and inner layer protected for a longer period.

PRODUCT LINE FOR GALVANIZED STEEL PIPE
With a closed production line system equipped with modern technology from Europe, Japan, Korea, Taiwan, Chinh Dai Steel always ensure the best quality of galvanized steel pipes supervised by Quality Management System ISO 9001: 2008.
ADVANCED TECHNOLOGY FOR GALVANIZED STEEL PIPE
Chinh Dai Steel applies seven technology steps. Modern machinery and advanced technology used to make galvanized steel pipes contribute to save energy and reduce production costs. The production process is closed from raw material to final product. Each production stage uses a separate and modern production line.With modern and closed production line, strict quality control from input to output, Chinh Dai's steel pipe is always ensured the best quality, accurate thickness, and surface size.

MANUFACTURING PROCESS FOR GALVANIZED STEEL PIPE


Product ID
H5-1800x2100-115x42
Height* 
1800 mm
Width*
2100 mm
Material 
115x42 mm ASTM 500
Rail Quantity 
5
Thickness*
1.5 mm
Welded Parts
U lugs, L lugs, panel base
Minimum of Quantity
One 40ft container
Weight
44.77kg
Application
Cattle panel
Products Show
Packing and Delivery

Packing


All products are in-door containerized for exporting purpose.
Plywood/metal dunnage for pipes.
Metal pallet for panels.

Delivery


30 – 60 days after receiving the deposit (depends on distance).

Our Service

Consultancy

Free consultancy via 24/7 hotline, email, website.
Reply inquiries in 24 hours.
Private information and ideas of design are protected.

Payment

Letter of Credit
T/T 30/70

Our Company

Factory

Our Factory


Office

Our office

Warehouse

Chinh Dai Industrial Co., Ltd

Chinh Dai Industrial Co., Ltd specializes in manufacturing and trading many kinds of Galvanize steel rolls, Galvanize steel pipes, Black square steel pipes, and Special productions. After 17 years of continuous expansion and innovation, Chinh Dai Steel has become one of the leading steel pipes manufacturers in the region with the presence in many large-scale projects.

Our Certifications

Packing Details  : Packing, solid bicycle saddle, 50pcs/carton

Delivery Details : 3-30 days after order of Solid bicycle tire tubes

ISO 9001-2008

AS/NZS 1163-2009

ASTM A500

JIS G3302:2010

JIS G 3444:2010

JIS 3466:2010

FAQ


Q: Are you a manufacturer or trader?
A: We are a manufacturer, and we can have our own factory produced many steel products.

Q: Where is your factory?
A: Our factory is located in Hung Yen - Vietnam.

Q: Can you make the pipe according to the standard that we request?
A: Generally, we provide the steel in an equivalent standard, but we also manufacture the steel according to customer' request standard, it may request MOQ and please contact us to verify.

Q: Do you provide a Mill Test Certificate or Quality Certificate?
A: Yes, we provide it. And if you need other certificates, please let us know, we'll prepare it accordingly

Q: About the size
A: Commercial size is in stock, if you wanted a customized size, there'll ask MOQ and please contact us to verify

Q: What about your standard delivery date?
A: Within 15-25 days after receiving your deposit.

0.0097 s.