Concrete Formwork Factory Direct Reusable Aluminum 6061-T6 Custom-made GETO-C-03 Contemporary CN;JIN Hotel More Than 5 Years

Share on:


Price:$105.00 - $115.00
Price in USD:Details

Quantity:


Product Overview

Description


_01.jpg


_06.jpg


 

 








































ItemsAluminium formwork
1. MaterialAluminium alloy 6061-T6
2.Installation

After short period of training, workers can easily learn to install and dismantle the formwork.


3.Construction period3-5 days per storey.
4.Machine assistance

Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used, such as:


1) Shifting of reinforcing steel rebar into assembly point


2) Removing debris from site


3) Loading and Unloading materials from trucks into site storage area.


5.Quality of formworkThe aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won’t be wasted.
6.Plastering costAs the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stabilityThe load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap valueThe scrap value is about 50% of the new panel.

 


9.jpg



Product Advantages


9.png





Related Products


















Production Process


_12.jpg




2.jpg



Logistics and Transp


 




1.jpg



Installment Scene


 




_16.jpg



Our Company


 







 


 


 



Exhibition


 




_22.jpg



Our Service


 




_24.jpg_26.jpg