Недорогой склад из стали, склад со стальной рамой, строительная стальная конструкция (62125306336)

Сохранить в закладки:


Цена:3 013,52 ₽*
Стоимость в USD:Показать (текущая цена)

Количество:

  • В избранное

Описание и отзывы

Характеристики

 Steel cheap warehouse, steel frame warehouse, wherehouse steel structure

BY STEEL STRUCTURE GROUP---China Steel Structure Expert                                         One-stop Service:Designing,Fabrication,and Installation.

Certification: ISO 9001,CE,Lloyd's,SGS,BV.

OEM&ODM

 

Products Description

_02.jpg

 _03.jpg_04.jpg_05.jpg_06.jpg

Our overseas project

Experienced in Steel Structure Industry:Our products have been export to over 50 countries. Such as Qatar, UAE,Saudi Arabia,Russia, Romania,America, South America, Japan, Korea, Australia, France, Middle East, Malaysia, India, Brazil, other Africa countries and so on.

Related Products

Our productssteel structural warehouse building, workshop building, Agricultural building (Horse/cattle barn, poultry house), high rise steel building, heavy industrial steel structure building, car parking, steel structure aircraft hanger, school, office building, prefab house, container house, truss roof warehouses, sandwich panel, corrugated steel sheet, C&Z section steel purlin.

We can also supply different kind of doors and windows, cranes which is related to project.

Company Information

Factory Show

 

 

Production Process

 

 Our Equipments:

6 sets of production lines for welded H beam , annual output is 60000 tons

2 sets of production lines for C section steel , yearly output is 5000 tons

2 set of production lines for Z section steel, annual output is 5000 tons.

25 sets of production lines for Color coated corrugated steel sheets, annual output is 8000 tons.

3 sets of production lines for sandwich panels, annual capacity is 1200000 M2.

2 sets of CNC plane drilling machines.

uipment and Professional Production Line:

 

 Our Present Clients 

 

 Our teams

 

 

 Our Certificate

 

 

 

Packaging & Shipping

Packing: It will be packed into carton or bundled for the big beam and column will leave it as it is. Or packed the parts to the big pallet and push into the containers.

Shipping: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.

Our Services

 

Pre-Sales Service

1. Consultant service (Answering client's questions)

2. Primary design plan(Free)

3. Assisting client to choose suitable construction plan

4. Price calculation

5. Business&technology discussion

Sale Service

1. Submission of support reaction data for foundation

2. Submission of construction drawing

3. Providing requirements for embedding

4. Construction Manual

5. Fabrication & Packing

6. Statistical table of material

7. Delivery on time

8. Other requirements by Clients

After-Sale Service

1. Service of installation Supervision

2. Instruction for using after installation completed

 

Buying Guides

 Design Parameter-----To Offer a Most Satisfying Project Scheme!

1. Building area: Length mm x width mm x eave height mm ? Please advise?

2. Wind speed (Km/h)and snow load (kg/m2)in local area?

3. Roof and wall material: do you have any special requirements on roof and wall panel.

We have galvanized corrugated steel sheet, preprinted corrugated steel sheet, and Sandwich panels like EPS sandwich panel, Fiber glass sandwich panel, Rockwool sandwich panel,PU sandwich panel, the thickness is 50mm, 75mm, 100mm, The steel sheet for top and bottom sheet is from 0.3-0.7mm. Please let me know what kind will be satisfied for you?

4. Windows and doors: do you have any special requirements on Windows and doors 'material and size?

5. Do you want the skylight on the roof?  What material would you want?

6. Do you need the ventilator for the warehouse?

7. Crane (if have),Crane span, crane lift height, max lift capacity, max wheel pressure and min wheel pressure!

8. Steel structure finishing: do you want primer coating (paint, what kind of paint or just normal brand?) or hot dip galvanized?

FAQ

 Q1: Can I have a visit to your factory before the order?

 A: Why not? welcome to visit our factory. You can fly to Qingdao Airport.We will pick you up in the airport. Hotel booking service is available .  

 Q2: Do you supply installation service?

 A: Yes,we do. But you will pay for our professional fee if we install in your local place. Then we will send engineers to supervise it.

 Q3: How long can the space frame be used?

 A: The use life of the main structure is the designed used life, that is 50-100 years (standard request of GB).

 Q4: How long is the use life of roof cover?

 A: The use life of PE coating is usually 10-25 years. The use life of roof day-lighting panel is shorter, usually 8-15 years.

 Q5: What is the anti-rust treatment for steel structure?

 A: Anti-rust treatment of steel structure

  Normal anti-rust paint

  Anti-rust paint with epoxy zinc primer

  Hot-dip galvanization

  Hot-dip galvanization+PU finish

  Powder coating.

  Stainless steel structure: No.301/304/316 stainless steel structure.

  Q6:How do we cooperate on certatin project?

 Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal on alibaba.com with Trade Assurance.

 Project details ---> Drawings for your project ---> Revised drawings ---> Transaction confirmation with Trade Assurance

Q8:What is the delivery time?

 Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.

 

 

 

62125306336

Похожие товары

0.0384 s.