Share on (10000002010308):

Bioevopeak 1700 Degree Celsius Muffle Furnace Universal Lab High Temp Box Muffle Furnace
1. 1700°C maximum operating temperature;
2. High purity fibrous alumina insulation for maximum energy saving;
3. Double layer steel structure with air cooling fan to keep furnace's exteriors safe to touch;
4. Safety interlock with automatic power off the furnace when door is opened;
5. PID automatic control via current limiting phase angle fired the resistor, e.g. SC R (Silicon Controlled Rectifier);
6. Power control with 30 segments programmable.
Accessories (specify these at time of order)
1. Standard Accessories
Thermal gloves | Crucible Tongs | Thermocouple | Crucibles | Furnace Door Block | User Manual
2. Optional
Different chamber size for your choose;
LCD touch screen control for choose
Program software to connect computer for choose.
Content may be subject to modifications or corrections
FNC-BX1700-2
| FNC-BX1700-4
| FNC-BX1700-9
| FNC-BX1700-16 | |
Max. Temp (℃) | 1700℃ | |||
Continuous working temp. | ≤1600℃ | |||
Chamber size (W*D*Hmm) | 100×100×100 Or customize as your requirement | 150×200×150 Or customize as your requirement | 200×300×200 | 300×400×300 |
Heating element | MoSi2 heating rod | |||
Thermal couple | B type | |||
Chamber material | Ceramic fiber | |||
Heating rate | 0~30℃/mm, suggest to be 5-10℃/min; | |||
Thermal control accuracy | ±1℃ | |||
Temperature uniformity | ±5℃ | |||
Power supply | AC 100V-415V, 50Hz/60Hz | |||
Max. Power | 2kW for 100×100×100 (mm) | 4kW for 150×200×150 (mm) | 9kW for 200×300×200 (mm) | 16kW for 300×400×300 (mm) |
Please note:
- Heat up rate is measured by using an empty chamber.
- Holding power is measured at continuous operating temperature.

LCD Digital Orbital Shaker Double layer steel Muffle Furnace

Q: How about quality of the goods?
A:
l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.
New products from manufacturers at wholesale prices