Consumption 1.8~2 kg/mm/m² Note: This figure is theoretical and does not include for any additional material required due to surface porosity, surface profile, variations in level and wastage etc.
Application instructions
Priming Apply on dry substrate using a suitable tool such as a roller, squeegee or brush. Avoid formation of puddles. Note: A second application is recommended on high porosity, unsound or very absorbent substrates.
Mixing ▪ Pour 5~5.5 kg of clean, cool potable water into a suitably sized and clean mixing container, ensuring strict control of the water content (do not over-water). ▪ Add HE-3000 to the water, while slowly mixing, adding the complete contents of the bag. ▪ Mix with a high-speed drill (> 650 rpm) and an egg beater style mixing paddle to blend water and powder for approximately 2~3 minutes, until a lump-free and uniform mix has been produced. Note: Operating time: 10 ~ 15 minutes (temperature: + 15 ° C(+59°F) ~ + 35 ° C(+95°F))
Application ▪ Pour the mix and spread evenly, and control the material thickness by scrape rake. ▪ Even surfaces by smoothing trowel. ▪ Roll immediately with a spiked roller to ensure even thickness and achieve defoaming effect.
Shelf Life 6 months from date of production if stored properly in original, unopened and undamaged sealed packaging.
Storage Conditions Store dry at +5°C(+41°F)~+35 °C(+95°F) Protect from moisture, direct sunlight, flame sources and freezing.
Technical data sheet(TDS)
Company Profile
Our Advantages
◆Professional Specializing in chemical materials for 24 years.
◆Quality With stable and high product quality.
◆Service Professional team to provide service.
◆Performance Cases Rich experience and a lot of actual performance cases.
◆R&D Strong R&D team, constantly developing new products.