Share on (10000016166906):
Description: | ||
1. The stainless-steel hinges adopts a circular arc design, and a nylon sleeve is added to the axis, and there is no dust in friction 2. The unique sealing strip of the door frame with strong sealing performance and good noise reduction and sound insulation effect 3. Steel door panel, collision resistant, not easily deformed, easy to clean 4. Variety of styles, accept size customization | ||
Drawings & Quotation: | ||
(1) Support customization. | ||
(2) In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather, We will quote for you promptly. | ||
Name | Specifications |
Door frame | Galvanized sheet thickness |
Door panel | 1.2mm Galvanized sheet thickness |
Sandwich | 1.2mm Paper honeycomb, aluminum honeycomb, rock wool |
Observation window | Tempered double-layer insulating glass of thickness 5mm |
Locks | High-grade stainless-steel handle lock |
Lifting sweeping strip | Aluminum alloy + Silicone strip |
Hinge | 304 stainless steel hinges |
Other accessories | Door closer |













FAQ | ||||||||
01 | Q: Are you a trading company or a manufacturer? | |||||||
A: We're manufacturers. | ||||||||
02 | Q: What information is required for the quotation. | |||||||
A: Product image or 2D/3D design drawing/sample/or as your idea. | ||||||||
03 | Q: I have an idea for a new product. I don't know if it can be made. | |||||||
A: We will assess the technicalfeasibility of your ideas and design, and we can provide advice on materials and design to reduce your costs. | ||||||||
04 | Q: How long will it take to deliver? | |||||||
A: Generally, it takes 40 days( 30 days do model and 10 days do mass production) | ||||||||
New products from manufacturers at wholesale prices