Share on (11000000939278):









Specification Model | LG30 | LG50 | LG75 | LG100 | LG125 | LG200 | |||||||
Heating Areas(m2) | 30 | 50 | 75 | 100 | 125 | 200 | |||||||
Numbers of Vapor trap | Single | Double | Double | Double | Double | Double | Double | ||||||
Trapping Capacity | >400kg/batch | >66kg/h | >110kg/h | >165kg/h | >220kg/h | >275kg/h | >440kg/h | ||||||
Heating Medium | Water&electric | Water&Steam | |||||||||||
Heating Mode | Double side radiation | ||||||||||||
Temperature range of Heating plates | <95℃ | Normal Temp.~+130℃ | |||||||||||
Vacuum Pressure (Pa) | 20~133 | ||||||||||||
Need Refrigeration Capacity (t0=-40℃,tk=-35℃) (Kw) | 55 | 80 | 120 | 160 | 200 | 320 | |||||||
Consumption of Steam(kg/h) | None | 150 | 200 | 280 | 340 | 400 | 690 | ||||||
Electric Power Supply | 75KW | 40KW | 43KW | 63KW | 69KW | 85KW | 115KW | ||||||
Tray Numbers | 78 | 80 | 120 | 180 | 240 | 300 | 480 | ||||||
Loading Capacity of Raw Material(KG) | >390 | >400 | >600 | >900 | >1200 | >1500 | >2400 | ||||||




Xinyang Company closely cooperated with Atlas Company in Denmark, Harbin Commerce University, Zhejiang University and Northeastern University, etc., our team have supported over 1,500 food engineering projects both domestically and abroad, our products have been exported to USA, Canada, Germany, Netherland, Singapore, Thailand, Malaysia, Indonesia, Korea, Myanmar, Chile, Nigeria etc.


Service:
Training plan: We will provide training for those who operate and maintain the freeze-drying machines. Trained by supplier of the equipment in the process of installation and debugging, people can operate and solve the basic mechnical problems independently. In addition, the persons who work in general engineering such as refrigeration, boiler, and transformer substation shall be undertaken by skilled workers.
Warranty:
1. We guarantee that the commodity hereof is made of the best materials and new brand with top workmanship, and in accordance with quality specification stipulated in product Contract and Appendix.
2. Guarantee period shall be within 12 months from the date of acceptance. During this period, if there are quality problems, we will provide solution by verbal or written communication. If the problem is unsolved, our engineers will repair for you on site as soon as possible. The maintenance is free when there are non-operation errors; otherwise it is for the buyer’s account.

New products from manufacturers at wholesale prices