car anti theft device Real Time Location Tracking Device for truck tracker fleet car tracking device

Share on (11000004671304):


Price:$9.00 - $12.00

Quantity:


Product Overview

Description




Real Time Auto Car GPS Tracker 2G TK003 GPS Tracker





Products Specifications


GSM Specifications
GSM Chip
MT6261M
GSM Channel
850/900/1800/1900MHz
GPRS Class
12
Communication Protocol
TCP IP
Body Memory
32+32mb
Maximum Output
GSM/GSM900:33±2dBm GSM 1800/GSM1900:30±2dBm


GPS Specifications
GPS Chipset
AT6558R
Positioning Mode
GPS/BDS/LBS
Number of Channels
64
Positioning Accuracy
10m
Tracking Sensitivity
-160dbm
Positioning Time
1s (Warm Start), 30s (Cold Start)


Working Parameters
Device Agreement
GT06/JT080/HY
Working Voltage
9-100V DC
Working Current
≈22mA(12vDC)
Working Current
≈12mA(24vDC)
Quiescent Current
2.3mA(12vDC)
Battery
120mA
Storage Capacity of Blink Spot Track Points
1000+
Dimensions
L78.0mm*W26.0mm*H15.0mm
Net Weight
42g
Working Temperature
-20℃~+70℃
Working Humidity
20%~80%RH


Product Features




*Small and Light

*2G Worldwide Coverage

*Track
Vehicles, Assets, Fleets, eBikes

*GPS/BDS/LBS Positioning Technology

*Industrial-Grade High-Integration Antenna

*Axis G-Sensor for Shocking Alarm

*Smart Power-Saving & Wake-up

*DC External Voltage Detection

*ACC Detection

*Power Cut Off Alarm

*OverSpeed Alarm

*Software Mileage Statistics

*Real-time Vehicle Position Data



Optional Features
Customized/ODM (MOQ 500 Pieces)
Vehicle Remote Control 
Support Cut Off power of Vehicle Oil Pump Relay Required
Built In RS485 Port
Support External Oil Sensor,BMS Data, RFID and Camera
Global Management Platform 
Support ODM/OEM APP, Software (Extra Charge)
Equipment Data (Fuel Management or BMS etc.,)
Support Data In-Depth Processing and Manage


Note: For any other product development solutions, pls message us.



Optional Accessories


*SOS Panic/Emergency Button
(Addtional Cost Required )

Smartly Call/SMS/App Alert user after driver press this button
*MIC/Voice Monitor
(Addtional Cost required)

Voice Monitor
*Relay
(Addtional Cost required)

Cut Off Fuel Remotely once vehicle speed below 20km/h






Product Functions




Real-time Tracking Anywhere and Anytime
Enjoy your real-time tracking and check the 180 Days historical traces via Phone or PC.
For fleet management purposes, the historical data is a key to help reduce fuel cost and CO2 emissions. Check the historical routes together with the reports, get your fleet in control.

Remotely Cut Off Fuel and Electricity (Extra Charged Relay Required, pls message us before order)
When user need to cut off vehicle Fuel/ Electricity/ Engine remotely, user could easily send vehicle a command via SMS/APP in phone or software platform in PC. After receiving this command, the vehicle engine will stop within 10s-20s. Once stop, vehicle will not move until receiving a Recover Command from user.
Note: Only when vehicle's running below 20KM/h, then the vehicle could stop after receiving this command. If the vehicle's running above 20KM/h, then vehicle engine can't be shut down.

SOS (Panic) Button For Added Safety (Extra Charged Cables Required, pls message us before order)
Receive instant alerts when the SOS button is pressed and driver needs help. Give driver a tracker via SOS button and it could easily send an instant alert to phone via SMS or APP or to PC on Tracking Platform.
Note: Only when vehicle's running below 20KM/h, then the vehicle could stop after receiving this command. If the vehicle's running above 20KM/h, then vehicle engine can't be shut down.

Anti-theft Alerts & Geofencing — Detect Suspicious Activity & Attempted Theft
With built in G-Sensor and ACC detection, tracker could detect motion of vehicle and send to cloud server via 2G network in time. At the same time, user could receive instant alerts via APP, PC or SMS. Excellent for instantly alerting you to vandalism, attempted theft, or accidental damage these alerts can save you a trip to the mechanic or help you notify the police before it’s too late.
With advanced Geofencing, create custom safe areas via the app or PC.

Instant Platform Optional Alerts via SMS, APP or Software
Overspeed Alert, Power Off Alert, Anti-Thieft Alert, GEO Fence Alert and many other optional alerts are available on tracking platform.




Packaging


TK003S (SOS & MIC)
TK003W(WATERPROOF)
TK003 (BASIC)



Tracking Platform


Compatible Protocols
GT06/JT808/HY
Compatible Public Tracking Platforms
GPS Server, Trackway, Ruhavi


GPSSKY Platform:
//www.18gps.net
App:YUNZHIXING
Platform Demo:
//www.18gps.net/dealer/?mds=d630165c65834293bb27ac1460d75e68



FREE, Accurate, Powerful
18GPS.net is the first choice platform of car positioning which performs functions: 
Vehicle Networking Monitoring Center Platform
WAP Query Platform
Service Provider Value Added Service System
Mobile Vehicle Networking
Social Account




Why Choose Us



14 YEARS R&D experience in GPS Tracking Industry

ORIGINAL DEVELOPER and Patent Owner of TK003 Series

TOP R&D TEAM and Ability in GPS Tracking Industry in Shenzhen, China

A PROFESSIONAL GPS SOLUTION PROVIDER



Company Profile




FAQ


1,Q: Are you the manufacturer? 
A:Yes, we are manufacturer of GPS Tracker with more than 14 years GPS product development experience. We have a professional hardware and software engineer team to achieve customers' requirements.


2,Q:How long is the product warranty?
A:We stand behind our products. All products are covered by 12- Months replacement warranty.


3,Q:Do you support OEM order with my own Logo?
 A: Yes, we could put your logo on item when order quantity above 100 pieces.


4,Q: Do you support ODM order to customize item hardware or software?
A: Yes, we do! Please kindly message your requirements and we'll bring up a solution for you.


5,Q: What is your Payment Term?
A: 1.We accept T/T Bank Transfer, Western Union, Paypal and Alibaba online transaction.
    2.For general order, we accept 100% full payment before shipping. For OEM/ODM order, 30% advance payment and 70% left payment before shipment.





0.2167 s.