Mining Portable CIP Gold Processing Plant Gold Mining Separation Equipment for Sale

Share on (11000015433161):


Price:$72,600.00 - $72,833.00

Quantity:


Product Overview

Description



Mining Portable CIP Gold Processing Plant Gold Mining Separation Equipment for Sale


Product Description






Gold Ore beneficiation process is the most common and advanced technology at present. Leaching and adsorption process can work both at the same time. Also, Gold Ore beneficiation process has wide adaptability, high recovery rate and high automation rate.

Zoomjo offers turnkey solutions for 50-1000tpd Gold Mining Equipment- Gold CIL Plant. We are one of the leading project suppliers. Gold CIL Plant and we work closely with our customers to fulfill their specific needs for a customized packaged solution. Specialized in the fabrication of these machines for 40 years and this enables us to be in a leading position in the field of Mining Equipment- Gold CIL Plant.





Get 2023 Small Gold Mining Equipment Factory Price List Online
Just leave us your whatsapp or email, we send the latest price list to you.
Whenever, 7X24 hours online service is waiting for you.
Hot-sale in many countries: Zimbabwe, Mozambique, Zambia, South Africa, Kenya, Philippines, Indonesia, Vietnam, Uganda, Ethiopia,Tanzania, Peru, Mexico.


Working Flow






Main equipment for gold ore CIL process:

timesaver in the leaching process, thus reducing the production expenditure. Besides, advanced extraction technology improving the efficiency of gold extraction. The CIL production line is wider use than CIP in the mineral industry. Gold Processing Steps, Introduction of gold CIL production line:

A. RAW MATERIAL PREPARATION: vibration feeder- conveyor belt- crusher -Crushing- grinding- leaching- desorption electrolysis- tailings dehydration

B. LEACHING and elimination: The thickened material is leached from eight agitators; a qualified reagent is added to the first set of agitators, and the activated carbon is lifted from the last set of agitators to the second set of agitators via an airlift to resist electric currents The activated carbon from the second set of agitators is raised to a carbon screen to obtain gold-loaded carbon, and the remaining slurry is returned to the first set of agitators And then into the tailwater treatment phase.

C. Tail Water Treatment: The tailings will be raised to pressure filter, filter cake known as tailings, through the belt conveyor and truck transport to the yard, filtrate into the circulating water tank for reuse.

D. AURIFEROUS CARBON TREATMENT: Gold powder is obtained by batch treatment of gold-containing carbon by desorption and electrolysis equipment. The dust enters the furnace and turns to the bar. The gold-containing carbon after electrolysis can be returned to the final stage of the reprocessing flowchart.



product name
Gold Concentrate Grade/(g/t)
Gold recovery rate/%
before processing
gold concentrate
33.35
tailings
0.68
Raw ore
3.32
After processing
gold concentrate
34.38
tailings
0.34
Raw ore
3.30


Main Equipment


This complete CIP gold process plant includes Feeder, Jaw Crusher, Cone Crusher, Vibrating Screen, Belt Conveyors, Ball Mill, Spiral Classifier, Hydro Cyclone, Thickener, Leaching Tanks, Electrowinning And Desorption Device, Gold Smelting Furnace.


Jaw crusher
Jaw crusher is mainly used for crushing large particle stones, granite, limestone and construction waste, etc.
Ball Grinding Mill
Ball mill is the key equipment for grinding after the crushing process, can be used for the dry and wet grinding for all kinds of ores and other grind-able materials.








Flotation Separator
Flotation machine is the abbreviation of floating concentrator, which refers to the mechanical equipment to complete the flotation process.
Spiral Separator
Spirals are made of high-density fiberglass, high quality
emery and unsaturated resin.


In addition to separate gold, the process can also be used for flotation of copper ore, lead and zinc ore, hematite ore, tin ore, graphite ore, tungsten ore and other metals and non-metal ore.


Delivery Site







Packaging & Shipping

Packaging Details: We will make different packaging according to different machine sizes. Standard international export packing, container, wooden box.
Delivery Time: We will customize according to the actual needs of customers. Senior designers start to design the plan. After receiving the deposit, we will complete the delivery within 20 to 30 working days.


Customer Cases






Company Profile




ZOOMJO is a large-scale enterprise that mainly produces heavy mining machinery and integrates scientific research, production and sales. It mainly produces various large and medium-sized crushing equipment, sand making equipment, drying and calcining equipment, mineral processing equipment and other series of products.

ZOOMJO has developed steadily from its establishment to the present with its technical strength, and has grown stronger day by day, and has gathered a large number of high-level management and scientific research personnel. Our company covers an area of 50,000 square meters, and another 10,000 square meters of modern office space, R&D center and sales center. The company has more than 500 employees, including more than 20 intermediate technicians. With strong technical strength, scientific management system and high product quality, ZOOMJO will rapidly grow into an important production and export base of mining machinery.






FAQ


1. How is the quality of your products?

Our products are manufactured strictly according to national and international standard, and we take a test on every grinder before delivery.

2. Is the price of products reliable?

Yes, we are manufacturer and we have the strength to give you the lowest price compared with other dealers. However, we have the policy that "According to the quantity order, we will offer the lowest price as possible with our utterly honest attitude towards business ".

3. Will you help with installation and staff training?

Yes, we can send our engineers to your place to guide the installation and train your workers if needed, but the buyer should bear our technician’s round tickets, accommodation, and food.

4. Service and Payment Terms?
a. We usually accept T/T, L/C, but other terms also workable.
b. We take pictures of finished products before delivery.


0.0978 s.