Product Overview

Description

MCFM.jpg

 

Manual Capsule Filling Machine is one of the oldest as well as the most widely uses form of capsule filling. The machine is designed & manufactured with utmost care to handle all capsule sizes ranging from 00 to 5 and to give you trouble free services year after year.

 

Manual Capsule Filling Machine is widely uses in research Laboratories, Academic Institution, Herbal /Ayurvedic preparation and medium to small scale manufacturing industries. Apart from 300 Holes Manual Capsule Filling Machine, we also offer 100 Holes Manual Capsule Filling Machine.

 

Single Machine for.

Hard Gelatin capsules

HPMC capsules

Veg capsules

Capsule Combinations

00 – 0 – 1 & 2 in one machine

#3 – #4 in one machine

#5 in one machine

Filling Type

Powder

Pellets

Granules

 

 

 

 

 

 

 

 

 

IMG_20180821_172452 - Copy.jpg

 

Machine equipped with 3 Loading Trays

DSCN0957.JPG

 

 

Option of Manual Loader and Automatic Loader

 

Manual Capsule Loader.jpg

 

 

Automatic Capsule loader.jpg

 