Share on (1293338310):
Fleck 2750 Valve:
1" Commercial Control Valve
Features:
(1)Suitable for large residential/light commercial applications
(2)Fully adjustable, 5-cycle control delivers controlled upflow backwash, downflow brining and slow rinse, rapid rinse, timed brine refill and downflow service
(3)Backwash capacity handles tanks up to 24" diameter
(4)Mechanical control (7- or 12-day clock or metered initiated regeneration)
(5)Valve body is solid, lead-free brass
(6)Time tested, hydraulically-balanced piston, seal, and spacer concept to pilot service flow and regeneration
TESTED AND CERTIFIED By the WQA To NSF/ANSI SDT. 61 Section 8 Material Safety Only and ANNEX "G"
Options:
(1)Backwash filter
(2)Hot water (time clock 180°F, meter 150°F)
(3)Meter-initiated regeneration
(4)Manual operation
(5)Service valve operator
(6)No hard water bypass
(7)Electronic timer, SE, XT, 3214NXT, or 3200NT
(8)Environmental cover
(9)Auxiliary switches
WATER PRESSURE: A minimum of 25 pounds of water pressure is required for regeneration valve to operate effectively.
ELECTRICAL FACILITIES: A continuous 110 volt, 60 Hertz current supply is required. Make certain the current supply is always hot and cannot be turned off with another switch. (Other voltages available.)
EXISTING PLUMBING: Condition of existing plumbing should be free from lime and iron buildup. Piping that is built up heavily with lime and/or iron should be replaced. If piping is clogged with iron, a separate iron filter unit should be installed ahead of the water softener.
LOCATION OF SOFTENER AND DRAIN: The softener should be located close to a drain.
BY-PASS VALVES: Always provide for the installation of a by-pass valve.
CAUTION: Water pressure is not to exceed 120 p.s.i., water temperature is not to exceed 100°F, and the unit cannot be subjected to freezing conditions.
2750-Down flow

2750-Up flow

![A50@$[1]YSFXY5G}$H}$_PI.jpg](http://sc01.alicdn.com/kf/HTB12GDWvDJYBeNjy1zeq6yhzVXaS/205807989/HTB12GDWvDJYBeNjy1zeq6yhzVXaS.jpg)
![XQ%O6%_${B]7P`AIMD{$F`2.jpg](http://sc01.alicdn.com/kf/HTB1DNSNvCBYBeNjy0Feq6znmFXaG/205807989/HTB1DNSNvCBYBeNjy0Feq6znmFXaG.jpg)
System #4 - Typical Single Tank Installation with Optional Meter

System #5 Interlock - Typical Twin Tank Installation with Optional Meter Interlock and No Hard Water Bypass

System 6 - Twin Series Regeneration Installation with a Remote Meter

System 7 - Twin Alternator Installation with a Remote Meter

| FELCK valve |
| Fleck valve covers a wide range of flow rate which can meet request for different water output demand. |
All the equipments is high quality components designation and 100% factory tested before shipment. 1-Year Manufacturer's warranty Years of trouble free service offered. So any problem, any question, please do not hesitate to contact me, and I will help you to solve your problem within 24 hours.
Withhighly-quality purified water treatment plant and accessories,the quality is absolutely guaranteed. By the way, we always offer spare accessories that easy loss by free. So you can choose our equipments or accessories with zero worry and no risk.
Best quality+ Thoughtful service=100% trust
New products from manufacturers at wholesale prices