Share on (1297799662):
1. Space required for the whole set of equipment at150 s.q.m
2. Labor required for operation 4 workers
3. Installation
we will give the foundation drawings to buyers after make the order. And also,our company will send 2 professional technician
for guiding your installation,testing the machine and training your workers. The installation period shall be 20days. You shall pay
for the technician with $50.00 per day per person and also the round-trip air ticket and accommodation.
4. Warranty
a. The reactor guarantee period shall be 60 months
b. Transmission equipment guarantee period shall be 36 months
c. Valve,meter and switch box guarantee period shall be 24 months




The Main Model & Capacity
No. | Model | Reactor Size | Weight | Volume | Space Required | Capacity | Note |
1 | XD/05 | 2000mm*5000mm | 27MT | 22m³ | 80-100. s.q.m | 5MT/Batch | 3Batches 2Days |
2 | XD/06 | 2200mm*6000mm | 30MT | 23m³ | 100-120. s.q.m | 6MT/Batch | 3Batches 2Days |
3 | XD/08 | 2200mm*6600mm | 32MT | 25m³ | 150. s.q.m | 8MT/Batch | 1 Batch 1Day |
4 | XD/10 | 2600mm*6600mm | 38MT | 35m³ | 150-200. s.q.m | 10MT/Batch | 1 Batch 1Day |
5 | XD/12 | 2800mm*6600mm | 40MT | 40m³ | 150-200. s.q.m | 12MT/Batch | 1 Batch 1Day |


Processing time for one batch/ waste tyre oil extraction machine
No. | Model | Feeding Time | Processing Time | Cooling Time | Discharge Carbon Time | Delivery Time | Installation and Training Time |
1 | XD/05 | 1-2Hrs | 6-8Hrs | 2Hrs | 1-2Hrs | 30days after getting deposit | 20days |
2 | XD/06 | 1-2Hrs | 6-8Hrs | 2-3Hrs | 1-2Hrs | 30days after getting deposit | 20days |
3 | XD/08 | 2-3Hrs | 9-11Hrs | 2-3Hrs | 1-2Hrs | 30days after getting deposit | 20days |
4 | XD/10 | 3-4Hrs | 9-11Hrs | 3-4Hrs | 2-3Hrs | 30days after getting deposit | 20days |
5 | XD/12 | 3-4Hrs | 11-13Hrs | 3-4Hrs | 2-3Hrs | 30days after getting deposit | 20day |