High Quality Protective Molle System Tactical Plate Carrier Tactical Training Vest

Share on (1307593072):


Price:$20.00 - $24.00

Quantity:


Product Overview

Description


Welcome to NINGBO WEINUO PROTECTIVE EQUIPMENT Co.LTD



















Product range  Click below to choose your desired product categories
Tactical Knee PadsGarden Knee PadsSports Knee PadsBack Support BeltTool BagGaitersAnti Riot SuitOutdoor EquipmentVest

 



Product Description


 




High Quality Protective Tactical Vest


High Quality Army/Tactical Vest


Item no:WN-010214


 


Features:


 


1.Armor plates can be inserted into pockets on the front and the back of the vest


2.Multiple layers which include high quality 100% cotton inside,makes this vest looks soild as the real one


3.Webbing and the seams on this vest is ultra-tough,it also features UTX clips for additional equipment and tools


 


If the products above all are not you are interested in,Pls get in touch with me and we could talk about the details


 


 

































Material1000D Nylon Fabric
SizeOne size fits all
ColorCamouflage
Weight1.4kg
Sample lead time Within 8 Days
Payment terms

FOB NINGBO/ FOB SHANGHAI,


T/T (30% in advance, 70% upon the copy of B/L)


Delivery Within 30 Days after got your deposit

 


2


 photobank


photobank (10)


photobank (4)


 


 IMG_2615


IMG_2616


 








































 



Packaging & Shipping


 


Packing:
1pc/PE bag+Head card
QTY/CTN:6PCS
G.W/CTN:10.0KGS
N.W/CTN:8.8KGS
SIZE:41*40*40CM


packing1


 





Why Choose Us


 factory1


process2


us2


E&S1


ce2




 


 



FAQ


 


Q 1 - Are you Trading company or Manufacturer?
A: We are the manufacturer and we have design group.


 


Q 2 - How far away from the Ningbo Railway Station or Ningbo Airport?
A: There're 35 minutes and 40 minutes by car spearately.



Q 3 - What's your MOQ?
A: 500 pieces.Small orders are also acceptable for first quality testing.


 


Q 4 - How can we get some samples?
A: Free samples but the transport fee on customer's cost.


 


Q 5 - What's your production lead time?
A: Usually within 30 days after got the deposit. 12 days for purchasing raw materials, 2 days cutting raw materials, 10 days for sewing, the following days for packing.


 




 

0.1898 s.