Share on (1443518670):

Secondary Plug Socket of the circuit breaker
Basic Parameters
JZ-58 secondary plug socket
Secondary plug socket for vacuum circuit breaker
1. Simple structure and reasonable price
2.OEM orders are welcome
Item No: JZ-58
Secondary plug socket is in the digestion and absorption of AAB products based on the techniques of product developed successfully , and reach the level of ABB products all the international product GZS ,(match VS1 VD1) etc KYN28-12 Setting up the switchgear secondary line connection .Its performance conforms to the exchange metal-enclosed switchgear and this product technical requirement.
Parameters
| Rated Voltage | Rated Current | Mechanical endurance |
| AC 380V | AC 16A/ | 2000 times |
| DC 220V | DC 10A |

Drawing

Application



![]() |
Yueqing Liyond Electric Co.,Ltd was established in 2011, located in Yueqing City, Zhejiang Province, China. Liyond has become a high-tech enterprise integrating the R&D, manufacturin and sales of mid and high voltage switchgear and accessories products. We have excellent management team and technical team. They have tacit cooperation in product development, promotion and maintenance. Our business philosophy is customer-centric. "Service" throughout the company's operations and management of every detail, has received extensive trust and support from customers. Liyond realize standardization and institutionalize management, committed to the power industry development and innovation.
|




Q: Could I have prices of your products?
A: Welcome. Please feel free to send us inquiry here. We will reply you within 24 hours.
Q: Can I get a sample before the bulk order?
A: Yes, we welcome sample order to test and check quality.Mixed samples are acceptable.
Q: Can we print our logo/ company name on products?
A: Yes, of course, we accept OEM, then need you to provide brand authorization to us
Q:Do you accept product customization?
A:Yes, of course, please provide specific drawings or parameters, we will quote you after evaluation
Q: What is the lead time?
A: The lead time depends on the quantities ordered, generally within 7-20 days after receiving the payment.
Q: What is your Trade Terms?
A: We accept EXW, FOB, CIF, FCA, etc.
Q: What is your payment method?
A: We accept T/T, Western Union, Paypal, irrevocable L/C at sight, etc
Q: Do you inspect the finished products?
A: Yes, each step of production and finished products will be came out inspection by QC department before shipping. And we will provide goods inspection reports for your reference before shipment
Q: How to solve the quality problems after sales?
A: Take photos of the quality problems and send to us for our checking and confirming, we will make a satisfied solution for you within 3 days.
New products from manufacturers at wholesale prices