Черное жидкое резиновое модифицированное асфальтовое водонепроницаемое покрытие для крыши

Share on (1600064253306):


Price:

Quantity:


Product Overview

Description



Product Description


Liquid rubber modified asphalt waterproof coating


The product is a water-based environment-friendly waterproof coating made of petroleum asphalt as the base material, high quality rubber as the modifier, natural nanoparticles as the filler, and assisted by the scientific formulation of polymer.
The product is non-toxic, tasteless, no environmental pollution, can be cold construction in wet base, coating film dry after excellent acid, alkali resistance, weather resistance.




Name
SBS liquid membrane II -- Elasticity rubber modified asphalt waterproof coating
Color
Black
Weight
18KG/barrel or 20KG/barrel
Features
*  (1) Easy to construct;
*  (2) Strong adhesion, anti-aging, high elasticity;
*  (3) No toxic substances such as coal tar, no burning,


Technical principle
Non-curable rubber asphalt waterproof material is composed of rubber, asphalt, softening oil and temperature control agent,elastoplastic rubber, after long-term contact with the air will not cure, and has a good adhesion, can replace the cold adhesive
used in cold adhesive construction waterproof material


* Roofing and underground engineering, municipal, bridge, subway, dam and other projects suitable for civil and industrial
buildings;
* Toilets and pools, balconies, parking lots, etc.
* Complex shapes and vertical and horizontal sections of pipes.



Detailed Images






The preparatory work

1. Materials and construction tools Machines and tools: agitator, mixing bucket, brush, broom, scraper, etc

2. The base surface should be smooth, dry and clean without oil stains. Tools such as scraper and broom should be used to clean surfaces of floating ash and other sundries.

Construction requirements:

1) Base coating construction, evenly coat the film material on the base surface, do not pile up or expose white during coating, the coating quantity should be 0.2-0.3kg/㎡, the base coating should be cured for more than 5h for the next process construction.

2) Waterproof coating construction: the coating material should be used several times in small amount to make the film thickness even and reduce bubbles.Coating quantity 0.4-0.5kg/㎡ is appropriate. After coating, it is generally required to solidify for more than 5h. When the finger contact is basically non-sticky, the second coating shall be carried out in the vertical direction.

3) At the negative corner where the bottom plate is connected with the wall, it is advisable to lay fiber non-woven cloth for reinforcement.Pipes,Equipment foundation floor leakage around, the Yin and Yang Angle of the ground should be enhanced coating brush, the wall from the ground within 30 cm to coat film, and coating brush 3-4 times, the plane base coating brush 2-3 times is appropriate.




Application:


1. Waterproof engineering of roofs and side walls of industrial and civil buildings;

2. Planting roof waterproofing project;

3, underground structure, subway station, tunnel and other waterproof works;

4, roads, Bridges, railways and other waterproof works;

5. Waterproofing works such as dykes and water conservancy facilities;



Packing & Delivery


                                      We can choose the packing according to your requirement.



PACKAGE:
Standard export  packing.

DELIVERY TIME:
3-20 days after confirming order,detail delivery date should be decided according to
production season and order quantity.







Certifications








FAQ







0.248 s.