Share on (1600084201276):
| Coating Lines Application | Industry |
| Engineer experience | 6-30 Years |
| Supply Experiece | To Germany/ Japanese/ American Companies |
| Raw Material | Higher Quality Standard Steel, PP panel |
| Electronics Partner | Siemens, Nordson |
| Weight | Customized |
| Voltage | 380V or customized |
| Processing material | Steel |
| Coating process | Powder Coating |
Drying & Curing System:
Processing of electric powder painting drying oven:
After surface pretreatment, paint spray or powder coating process, the workpiece needs to be dried and cured in the paint drying or powder curing oven so as to reach the requirement of coating technology. Drying room/curing oven is an important process in coating line industry for coating film making. Whether the drying/curing equipment works properly will greatly affect the energy saving, coating film quality and the whole coating line costs. All our endeavors have been targeted to achieve customer satisfied good energy-saving and low-emission drying/curing equipment.
Specification and features of EDIT electric powder painting drying oven:
1. Electric powder painting drying oven substrate: Structural frame, Galvanizing sheet and plate, Stainless steel etc.
2. Heat insulation wall: Sandwiches rock wall to maintain the temperature.
3. Complete Inner Heating air circulation system prevent the loss of source, saving energy.
4. Assembling and integrated structure electric powder curing oven is available.
5. Sliding loading trolleys are available.
Specification and features of EDIT electric powder painting curing oven:
1.Reach curing temperatures faster and cost less;
2.Innovative air flow design keeps the oven interior evenly heated while saving fuel.
3.Ovens are designed specifically for powder coating.
4.Use genuine high-density mineral wool insulation that keeps the heat in the coating oven cabin and out of your work space.
Our Philosophy--More Heat. More Steam. Less Cost.




1. Are we a manufacturer?
Yes, we are a manufacturer of coating equipment for 13 years, having our
own design team.
2. What should a customer provide us if customer is interested in our
equipment or solutions?
Customer should provide parameters of metal workpiece:
*Material *Shape *Size *Max Weight *Output per hour *Heating
Power * Your Factory Planning chart.
3. About payment term?
We prefer TT. It is negotiable.
4. About delivery time?
It depends on the volume of your order. Basically, 30-90days after pay-
ment.
5. Where Are We?
We are in the old industrial base of northeast China, Liaoning Province,
Dalian City.
New products from manufacturers at wholesale prices