1.Quality guarantee After the machine completed producing, the factory arrange the test practice, to ensure the smooth operation
of the machine. 2.Warranty 100% brand new when leaving the factory. The seller guarantee quality of the machines(excluding wearing parts)for a
period of one year from the date of trial run finish under our technician's guidance, but not exceed 15 months from date on which
machine leaves the factory.
3. Packing When the goods arrive at the customer site, simply connect power supply to trial
production. The products should be processed to be rustproof and moisture proof before delivery. The small parts are packed into
wooden crates; the big parts are wrapped by plastic sheeting.
4. Installation Installer should be familiar with the equipment
structure, capacity and technical requirement, set out suitable installation process rules in advance.