New 1 Year Warranty Hard Stone Crusher Production Line Plant China Manufacturer

Share on:


Price:$115,000.00 - $120,000.00
Price in USD:Details

Quantity:


Product Overview

Description





Product Description


The manganese copper ore crusher plant mainly includes two crushing machines, jaw crusher and cone crusher.
The first stage: coarse crushing: stone bulk material is uniformly fed by the vibrating feeder through the silo, and conveyed to the jaw crusher for coarse crushing. After the coarsely crushed material is fed into the cone crusher for secondary stage crushing. Then crushed stones are delivered to the vibrating screen. qualified crushed stones will deliverd to the stock pile as finished products while unqualified stones will come back to the crusher for further crushing till qualified.




Detailed Images


The hard stone production line mainly includes vibrating feeder, jaw crusher,spring cone crusher and circular vibrating screen.


NO.
Equioment
Model
Quantity
1
Vibrating Feeder
ZSW3895
1
2
Jaw Crusher
PE600*900
1
3
Spring Cone Crusher
PYB900
1
4
Vibrating Screen
3YK1860
1






Related Products




Company Introduction


Located in Zhengzhou, Henan Province of China, China First Engineering Technology Co., Ltd. (CFTC) is specialized in research, development, manufacture and sales service of mining equipment. We have the only academician orkstation and researching center of high-quality aggregate in China.




FAQ


1.Quality guarantee After the machine completed producing, the factory arrange the test practice, to ensure the smooth operation
of the machine. 
2.Warranty 100% brand new when leaving the factory. The seller guarantee quality of the machines(excluding wearing parts)for a
period of one year from the date of trial run finish under our technician's guidance, but not exceed 15 months from date on which
machine leaves the factory. 
3. Packing When the goods arrive at the customer site, simply connect power supply to trial
production. The products should be processed to be rustproof and moisture proof before delivery. The small parts are packed into
wooden crates; the big parts are wrapped by plastic sheeting. 
4. Installation Installer should be familiar with the equipment
structure, capacity and technical requirement, set out suitable installation process rules in advance.


0.0138 s.