Share on (1600119199823):
Waste incineration is a kind of waste treatment method, Incinerators reduce the solid mass of the original waste by 80–85% and the volume reduced by 95–96%. The highest temperature of incinerator runing can reach 1100-1300 degrees Celsius, which can achieve the effect of sterilization and disinfection. There will be no smoke, no smell, no pollution after waste be burning.
It has the advantages of small volume, good combustion effect, reasonable combustion technology, high pollution-free degree and so on. It is an ideal choice for waste treatment in hospitals, hotels and various regions.

1.Medical Wastes treatment: hospital wastes such as: bandage , swaps,needles, injection syringe, drop bottle, lab waste, expired drugs, infectious internal organ, napkin, diaper, mask, gloves, straps, gauze, blood vessels, organs,pharmaceutical waste, hazardous wastes , Laboratories wastes, healthcare waste.
2. Animal Wastes cremation: dead animal body and pets carcasses, Eg. dog, cat, chicken,cow,pig,duck,bull,buffaloes, fish, birds, cattle, etc, farm incinerators , such as cattle farms, pig farms, sheep farms, stables, kennels, abattoirs, testing laboratories, catteries, pet crematoriums and poultry farms, ABP rendering plants & other waste disposals.
3. Household Wastes disposal: rubbish, Cardboard, paper scraps, sawdust, bottles, , plastics. fruit peel, kitchen garbage, papers, trash, rags, leftovers, trees, leaves, lowers, roots, etc
4. Industrial Waste burning treatment: the general waste or solid waste produced in industrial area and factories and construction sites, environmental or recycling facilities, landfills, manufacturing, mining, agricultural eg. rubber, plastic, fiber, paper, leathers, wood, glass, general & material , domestic wastes or from industrial activities , solid incinerator for solid waste in factories & construction sites.
5. plastic waste burning treatment: (polymer waste):Plastic PE, PU, rubber (tire), Styrofoam, PET bottle, fiber, foam, cloth, bags, resin, acrylic, leather, Wood flour, urea powder, melon cloth, tapes, paints, polymers and so on.
6. Special waste: Waste oil, waste solvents, oil sludge, ash dust, iron paint, mold filter residue and so on.

1. Environmental protection, double cavity design, smokeless, odorless, pollution-free.
2. The highest temperature can reach 1100-1300 degrees Celsius, achieving the effect of sterilization
3. Long service hours.Heavy steel for construction.Insulated and fireproof lined room.
4. Easy to carry, small footprint.
5. Low operation and maintenance cost.

| Model | MGI-30 | MGI-50 | MGI-150 | MGI-300 | MGI-500 |
| Burning Capacity | 20-30kg/time (3-6 times/day) | 30-50kg/time (3-6times/day) | 100-150kg/time (3-6times/day) | 200-300kg/time (3-6times/day) | 300-400kg/time(3-6times/day) |
| Incinerator Size mm (L*H*B) | 1.45*0.9*1.75 | 1.8*1.15*3 | 2*1.4*3.5 | 2.2*1.4*3.8 | 3*2*4.8 |
| Imputing Mouth Width (mm) | 480*600 | 620*800 | 760*960 | 900*1100 | 1080*1280 |
|
Chimney External Diameter(mm)
|
280 | 280 | 300 | 400 | 460 |
| Draught Fan | 0.37kw | 0.37kw | 0.5kw | 1.1kw | 1.1kw/0.55kw |
| Combustion Improver Device |
0.11kw
|
0.11kw
|
0.11kw
|
0.22kw
|
0.22kw
|
|
Oil consumption: 4-6kg/h
|
Oil consumption: 4-10kg/h
|
Oil consumption: 4-10kg/h
|
Oil consumption: 7-14kg/h
|
Oil consumption: 7-14kg/h
|
|
| Re-Burning Device |
0.11 kw
|
0.11kw
|
0.22kw
|
0.37kw
|
0.37kw
|
|
Oil consumption 4-6 kg/h
|
Oil consumption: 4-10kg/h
|
Oil consumption: 7-14kg/h
|
Oil consumption: 10-20kg/h
|
Oil consumption: 15-26kg/h
|
|
| Voltage | 380v/220v | 380v/220v | 380v/220v | 380v/220v | 380v/220v |

Primary combustion chamber, secondary combustion chamber, cyclone dust collector, chimney, flue, pipeline system, high-pressure blower, auxiliary pressure induced fan, primary combustion machine, secondary combustion machine, and, electric control cabinet, temperature display device, detection device, etc.

Combustion process and brief description:
The waste is manually put into the primary combustion chamber of the furnace body, and the primary combustion is started automatically by temperature control. According to the principle of three T combustion (temperature, time and eddy current), the waste is fully oxidized, pyrolyzed and burnt in the combustion chamber of the furnace body. The flue gas generated by incineration enters the secondary combustion chamber, and the unburned harmful substances in the flue gas are further destroyed in the secondary combustion chamber. In order to completely decompose unburned materials and meet the discharge requirements, the second combustion chamber is equipped with a burner to support combustion and a unique secondary air supply device to ensure that the flue gas is in full contact with oxygen at high temperature, while ensuring the retention time of the flue gas in the second combustion chamber and adjusting the air supply according to the oxygen content of the flue gas at the outlet of the second combustion chamber. The temperature in the second combustion chamber shall be controlled and the dust with larger particles shall be removed through the dust collector, so that the incineration efficiency and destruction removal rate can reach more than 99%, so as to achieve the effect of no peculiar smell, no odor and no smoke, and reach the national emission standard, and then enter the chimney to discharge to the atmosphere. The ash generated after combustion shall be taken out, screened, transferred and buried manually.



Q: How to buy your idea products?
A: You can provide us the waste kind and waste quantity(connect us for more details). we will recommand you the suitable model incinerator.
Q: How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 3 to 4 weeks.
Q: How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. And we will send a technicians to guide for installation and debugging. after debugging equipment, he will teach your workers how to use it and how to maintain it.
Q: How about the warranty?
A: If there is any malfunction of the equipment during the warranty period, our company promises to propose a solution within 24 hours. If it is caused by non-human causes, our company provides repairs free of charge and guarantees that the equipment is running well again.
Q: What's the certification do you have?
A: We have CE, ISO9001, OHSAS18001, ISO14001 Certifications
New products from manufacturers at wholesale prices