ISO9001 factory customized deep drawing metal stamping parts with ROHs certified 1 buyer (1600158109480)

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description


.jpg


 


we are a manufacturer specialized in producing kinds of high precision metal parts, turning parts, CNC parts, heat sinks, etc. Our factory is located in Qingxi Town, Dongguan City, Guangdong Province, China. With a factory covers 6,000 square meters, our factory passed ISO9001  certification. We can produce kinds of metal parts according to customers' requirements with high quality, competitive prices, on time delivery.


.jpg


 


 






































A. Raw Material



Copper ,BeCu, phosphor copper, Brass, Stainless steel, Aluminum, SGCC, SECC, steel, spring steel, Nickel-Silver... and all different kinds of metal;



B. SPEC



 Roll material thickness is 0.05-10mm;sheet metal  thickness is 0.3-20mm;



C. Surface treatment



Gold / Silver /Tin / Nickel / Zinc /  Chromium / Copper-plating /  Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;



D. Application



All different kinds of telecom products, Automotive, high-end digital cameras, Medical Equipment, Remote, Washing machines , vacuum cleaners, desk lamp, Furniture, Switch Power Supply, Socket, water heater, High-end toys, Calculator, Electrical, Interphone, Wireless Mouse, Wifi Router, Cordless telephone, mobile phone, Mobile DVD, Sounder. Auto Clutch, bicycle brake, scooter and so on ;



E. Quotation



Please provide the Formal drawings (normally, with DWG/STP/PDF file ),and make note with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet in 48-72 hours;



F. Prototype & Mould



We make the prototypes or moulds according to the drawings that confirmed by both of us and customers! The lead time is depends on the structure and qty of parts, Normally, lead time for prototypes is 3-15 days; lead time for mould is 10-25 days;



G. Production



We will provide samples according to the drawings to customers for approval. Then arrange the production  and confirm the delivery date according to the Purchase Order; Normally , the lead time for production is 5-30 days ,the structure of parts is different , the lead time will be different .



H. Package



Plastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.



 


.jpg


 


02


mmexport1481702695745mmexport1480748021843mmexport1480748118246mmexport1481702558179LC-12mmexport1480748007077


 


.jpg


1.jpg


 


 


 


 


1600158109480
0.0066 s.