Test projects | Unit | Index | ||
Tensile Strength | Mpa | ≥9 | ||
Bending strength | Mpa | ≥15 | ||
Compressive strength | Mpa | ≥80 | ||
Abrasion resistance(750g/500r) | g | ≤0.03 | ||
Shore D hardness | ≥70 | |||
Drying time | Surface dry | h | ≤4 | |
Full dry | h | ≤24 | ||
Resistance to 120# gasoline | 7 days | No change | ||
Resistance to 10% sulfuric acid | 7 days | No change | ||
Resistance to 10% sodium hydroxide | 7 days | No change | ||
Resistance to 10% salt water | 7 days | No change | ||
Construction method | Main material | Auxiliary material | Reference dosage | |||||
Base surface treatment | Polish the base surface, repair defects, clean and dry | — | — | — | ||||
Primer layer | Roll coating epoxy primer | Dongsheng DS-30# | — | About 0.15Kg/m2 | ||||
Mortar layer | Use epoxy intermediate coating material to mix quartz sand to the thickness required for construction | Dongsheng DS-400 | Quartz sand | 0.60kg/m2·mm | ||||
Putty layer | Use epoxy top coating material to mix quartz powder or double fly powder to scrape putty layer | Dongsheng DS-400 | Quartz powder or double fly powder | 0.10kg/m2 one pass | ||||
The first top coat | Roll coating epoxy top coating material | Dongsheng DS-143 | — | 0.15kg/m2 | ||||
Orange coating | Scrape the orange topcoat and use a napping roller to nip | Dongsheng DS-670 | — | 0.30-0.60kg/m2 | ||||
●Coating thickness: generally 1mm-3mm, more than 2mm requires sanding | ||||||||