Share on (1600214099301):
| Product name | Electric drill flexible shaft |
| Material | Cast iron |
| Color | AS Picture |
| Delivery time | Quantity |
| OEM/ODM | Customization Service Provided |



Note:
It is best to install the flexible shaft on the machine before using it,
and use it after running at low speed for 15 minutes.
So that the parts inside run-in, there will be a little heat within 1-2 hours of starting to use.
which is a normal phenomenon during the run-in period, and it will be fine after the run-in is good.
The speed is recommended to be within 15000.
If the speed exceeds 15000, it is easy to vibrate.
Because it is a transfer, it cannot withstand a large speed.
When using it, try not to bend too much. Change direction frequently.
If it is too hot, stop and let the machine rest. This can effectively extend the service life!


Q1: Wonder if you accept small orders?
A1: Do not worry. Feel free to contact us .in order to get more orders and give our clients more convener ,we accept small order.
Q2: Can you send products to my country?
A2: Sure, we can. If you do not have your own ship forwarder, we can help you.
Q3: Can you do OEM for me?
A3: We accept all OEM orders,just contact us and give me your design.we will offer you a reasonable price and make samples for you ASAP.
Q4: What's your payment terms ?
A4: By T/T,LC AT SIGHT,30% deposit in advance, balance 70% before shipment.
Q5: How long is your production lead time?
A5:It depends on product and order qty. Normally, it takes us 15 days for an order with MOQ qty.
Q6: When can I get the quotation ?
A6: We usually quote you within 24 hours after we get your inquiry. If you are very urgent to get the quotation.Please call us or tell us in your mail, so that we could regard your inquiry priority.
New products from manufacturers at wholesale prices