Factory directly Supply Wax Pelletizing Machine for wax granulation

Share on (1600250408331):


Price:RUB 20,504,733.60

Quantity:


Product Overview

Description

1. Capacity: 5000kg/h

2.  Granulation rate: ≥99%

3. Final product dimension: 4-6mm(semi-ball form), conform to GB/T2449-2006

4. The machine can run 72 hours with 5000kg/h

Equipment Name
Wax Pastillator
Material
magnesium chloride
Capacity
5000kg/h
Final product
semi-ball, diameter 4-6mm, thickness 1.5-1.8mm, good strength
Heat medium
heat conduction oil
Working type
continuous or intermittent
Products Show
Our Service

Energy efficient


Environment friendly


High efficiency

Our Company

Factory

Our Factory

Workshop

Our Workshop

Warehouse

Our Warehouse

Team

Our Team

Our Certifications

Best Banghua Calcium chloride granulation plant/Calcium chloride granulation plant/Calcium chloride equipment

Banghua International Granulation Engineering Co., Ltd. is specialized in hot air furnace, heat exchanger and fluidized-bed spray granulation, evaporation, concentration and drying complete equipment. We could provide you a systematic solution with design, manufacture, installation and commissioning..

Customer Photo

Banghua  Steel belt and spray cooling system

Banghua International Granulation Engineering Co.,Ltd is specialized in the hot air furnace,heat exchanger technology research,development,design,production, installation,commissioning and other engineering contract.Relying on our own scientific and technological strength,we always commit to advanced stove,heat exchangers and other equipment design and manufacturing technology development. Self-developed direct coal (biomass)-fired hot air furnace and indirect coal (biomass)-fired hot air furnace which has hit the leading domestic level,are widely used in heating,drying,reaction, calcined and other industries.

Process flow introduction

Working principle:It adopts segmented frame, they will be assembled through screw in purchaser’s factory. Adopt annulus steel belt, the steel belt will be welded in purchaser’s factory. Adopt cooling water.
It is to cool the material on steel belt and to convey.
1. The steel belt is driven by the drum at the discharge end, the drive type is worm direct-coupled type. The rotation speed is
adjusted by inverter. Under the steel belt, there are 3 sections of spray cooling which spray cooling water to the back of
steel belt. So the granules on steel belt will be cooled.

Process flow introduction

2. Cooling water at back of steel belt drops down and is discharged through water exit at every cooling section.


3. There is a gas outlet at the upper side of the distributor, and the waste gas produced when the material is cooling will be
exhausted by fans.

4. To guarantee the steel belt’s long-time and continuous work, there are 4 anti-deviation switch at the lower part of frame with
alarm system which monitors the steel belt’s state and also interlocks with distributor system.

FAQ

Q: Are you trading company or manufacturer ?

A: Banghua International Granulation Engineering Co.,Ltd is specialized in the hot air furnace,heat exchanger technology research,development,design,production,installation,commissioning and other engineering contract.Relying on our own scientific and technological strength,we always commit to advanced stove,heat exchangers and other equipment design and manufacturing technology development. Self-developed direct coal (biomass)-fired hot air furnace and indirect coal (biomass)-fired hot air furnace which has hit the leading domestic level,are widely used in heating,drying,reaction,calcined and other industries.


The company has been passed the ISO9001:2008 international quality system certification.The company has completed product development system,quality management system and professional construction team,succeeded at home and abroad in undertaking hundreds of sets of hot air equipment design,manufacture,installation and commissioning.

Realistic,pragmatic,hard-working,enterprising,"Banghua"uphold "Honesty,cooperation and win-win"business philosophy,and always provide our customers with advanced technology,first-class products,quality service.We not only adhere to create more value for customers,but also to save energy,clean environment,promote human harmony with the environment to do our best.

Q: How long is your delivery time?

A: Generally it is 30-90, it is according to your details capacity demands and our factory busy situation.

Q: Do you provide client site case for investigation? 

A: Yes, we have many domestic and overseas site cases could for your investigation.

Q: What is your terms of payment ?

40% T/T in advance, 50% balance before shippment, 5% after installation and commissioning acceptance, 5% within 10 working days from the date of the expiration of warranty period of one year .

Contact Us

0.175 s.