rear jewell skoda lifter stabilus production line 30n 100n 450mm e90 compression f10 gas spring

Share on (1600301347828):


Price:

Quantity:


Product Overview

Description







Material
Spring steel (SWC), Music wire(SWP), Stainless steel(SUS), Mild-carbon steel, Phosphor copper, Beryllium copper, Brass, Aluminum
60Si2Mn,55CrSi, Alloy steel etc.
—Stainless steel 17-7-PH(631SUS), Inconel X750, Bezinal Wire etc
Color
custom
MOQ
500pcs
Quality Assurance
ISO9001: 2015, SGS, RoHS, TUV
Payment Terms
T/T/Paypal/Alibaba assurance
Finish
Nickel / Zinc / Copper / Chrome / Tin / Silver /Gold / Dacromet plating, , E-coating, Blacking,Powder coating, PVC dipped etc
Lead Time
1-2 weeks for samples, 3-4 weeks for mass production
Drawing Formats
PRO/E, Auto CAD, Solid Works , UG, CAD / CAM / CAE, PDF
Size
Customized according to your drawing.
Samples
sample available
Logo
custom logo available


Our Advantages
1.) 24 Hours Online Service & Quickly Quote / Delivery.
2.) 100% QC quality inspection before delivery, and can provide quality inspection form.
3.) 15+ years of experience in the CNC machining area and have a senior design team to offer perfect modification suggestions.














Q:Is your factory a trade or production factory?
A:My factory is production-oriented factory. The company has a independent engineering design team,quality team,production team,process technology: precision CNC parts, stamping parts, metal lathe parts, welding parts, electronic accessories, die cutting professional manufacturing plant for parts and precision molds.

Q:Do you provide OEM/ODM services?
A:The company is committed to development, production,assembly, ODM one-stop service.We have an independent engineering design, quality and production team.

Q:How to get samples and the delivery time?
A:If you provide drawings or we provide a plan, the sample time is about seven days, and the delivery time is about ten days.

Q:How long does it take for bulk delivery?
A:After receiving the order and payment, it's normally ten days to start the delivery. If solution is urgent, we can discuss priority processing.

Q:How does the factory control product quality?
A:Our company has passed ISO9001:2008 and ISO14001:2008 system certification. All quality control links are strictly checked from raw materials to process inspections to shipment inspections are supervised by professionals.




0.2195 s.