20P105 ABE 1.5 1250, Expanded metal mesh machine, Expanded metal mesh production line, Steel metal expanding machine

Share on (1600301398340):


Price:RUB 4,458,486.00

Quantity:


Product Overview

Description

Product Description

Expanded metal mesh machine

Expanded Metal mesh is traditionally seen as a metal material with diamond shaped holes. Expanded Metal is produced by an expanding machine, which uses a pressured slitting and stretching process to transform solid metal sheets and coils into expanded mesh. Most types of metal, including precious and specially produced metals, can be expanded.

 

Expanded Metal Mesh Production Process:

1. Sheets or coils or metal are fed into the expanding machine. A little metal can create a lot of mesh, adding value and saving resources and money.

2. Each machine is fitted with a unique "Knife", dedicated to a particular pattern. New patterns and knives can be created in-house for specific applications.

3. The machines are then programmed or manually controlled to ensure the metal is expanded to the exact specification. Rigorous quality checks are carried out to ensure product consistency throughout the expanding process.

4. Using the unique shearing and stretching process means very little waste is created. the metal is sheared and then stretched in a single process creating the apertures and therefore expanding the metal. The mesh is then either cut into sheets or wound onto coils ready for shipping or further processing.

 

Main Technical Parameters:

Model: ABE-1.5-1250

Expanding force: 25T

Max. Coil width: 1250mm

Thickness of steel coil: Max. 1.5mm

Expanding speed: Max. 300 strokes/minute, mesh and sheet product can be 200 strokes/minute

Motor power: 5.5KW

Pressure force: 1.5KN

Adjust distance of connect rod: 10mm

Longitudinal feeding distance: 0-5mm

Horizontal swing distance: 0-20mm

Overall size of machine(L*W*H): 2500*1400*2150mm

Machine weight: about 4.7 tons

Controlled by PLC + touch screen; Length calculate + automatic cutting

Feeding type: servo motor

21P105-alibaba-

 

Expanded mesh leveling machine

Main technical parameters:

Model: ABE-XP1250

Max width of expanded metal mesh: 1250mm

Max thickness of raw material(mild steel): 1.0mm

Quantity of rolls: 17 rolls

Working method: 2 rolls feeding+15 rolls leveling

Diameter of rolls: 60mm

Surface Hard: HRC58

Motor power: 7.5KW

Weight: about 2.3T

Machine size(L*W*H):2520*1400*1440mm

Working speed: frequency control

21P105-alibaba-

 

 

5T Auto decoiler

Main technical parameters:

Load weight: ≤5T

Reel expansion and contraction range: φ420~510 mm

Uncoiling width: ≤1250mm

Center height of reel spindle: 1060mm

Decoiling speed: 2 r/min

Tension form: manual

Motor power: 1.5KW

Dimensions (L*W*H): 2270*1270*1535mm

Weight: about 890KG

21P105-alibaba-5T

 

Four-roller Flattening Machine

Description of expanded mesh flattening machine:

The flattening machine is an auxiliary equipment for the expanded metal mesh machine. For the expanded mesh, the flattening machine not only flattens the lap joint of the steel mesh, but also makes the surface of the stencil smooth and beautiful, and at the same time, can eliminate the internal force generated during the weaving process, thereby improving the stencil Steely.

 

Main Technical Parameters flattening machine:

Model: ABE-FYP1250

Max. Expanded mesh width: 1250mm

Roller length: 1350mm

Roller quantity * diameter=2*280+2*450mm

Hardness of roller: HRC53

Roller material: alloy steel

Adjusted method: worm and gear+hand wheel

Motor power: 11kw, speed adjustable system

Overall size of machine(L*W*H): about 3220*1200*2100mm

Machine weight: about 7 tons21P105-alibaba-

 

 

 

Contact us

 

 

 

 

Packaging & Shipping

1 

Our Services
 
banner01
Warranty
Within the limits of what hereinafter set forth, ANBER undertakes to remedy all defects of the equipment attributable to its engineering, material and workmanship. Such obligation of ANBER is limited to defects that show within 12 (twelve) months from the delivery of the equipment. 
To benefit from these rights, Buyer shall notify within 8 days of its discovery to ANBER, in writing, analytically and precisely, all shown defects.

Installation and commissioning
Machine is installed and commissioned by ANBER technicians. Testing cost, travel, accommodation and meal expenses are payable by the customer, the customer will provide local engineers and staff to support the installation. 
ABO- EXHIBITION

From 2013, we ABO have attend many fairs, like 

"IBS&KBIS 2016" in Las Vegas, 2016 BIG5 in Dubai, we will attend annual fair to show our new type.

Here is the fair show.

.jpg 

ABO-CERTIFICATE

For metal beads and lath, we ABO have got many certificate,

1, rib lath sliting device patent,

2, multi angle beads slitting and rollforming patent,

3, Architrave beads patent,

4, Hi-tech enterprise cartificate

5, chinese industry-academy-research reward

.jpg 

Company Information

+wangzhan_14

                                                   .png

                                    Scan with wechat                      Our website
 

Add: No. 525, Jindong road, Jinxi town, Kunshan, China
Tel: (+86)-510-88239310/88239309
Fax: (+86)-510-88237950
Web: www.china-anbermachine.com

 

 

FAQ

1. How long will your engineer reach our factory?

Within one week after machine arrival your factory.

 

2. How many days will you finish installing?

Normally we will finish installation and training within 7 days. Machine installation only need 1-2 days. The left time just training your workers.

 

3. What should we charge for your engineer?

You should charge for the air tickets, hotel, food and also their salary 100USD one day per person.

 

4. How long is your machine's warranty period?

All our machine have one year guarantee, starting from the machine finished installation.

 

5. How could we do after one year warranty period?

We can also do service for you, but you need pay for spare parts and engineer's cost.

 

6. How could we do if the parts broken within warranty?

We would express the free replacement parts during the warranty date.

 

7. Does your engineer understand English?

Our engineer understand a little English. All our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.

 

8. How do we solve the machine problem after your engineer leaving?

Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according your description.

 

9. How many worker do we need running those machines?

One or two workers required for machine operation, there will be only one worker for our micro type expanded metal mesh machine within 25T punching force otherwise need two workers for hevay duty expanded metal machine.

 

0.2059 s.