Factory directly selling 5 Tonne Traction Battery Locomotive for Mine Tunnel Transportation

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description



Product Description


Factory directly selling 5 Tonne Traction Battery Locomotive for Mine Tunnel Transportation




Product details





































































Adhesive weight5 tons
Track Gauge600, 762 or 900mm
Hourly System Traction7.06kN
Max. Traction12.26kN
Hourly System Speed(km/h)7km/h
Supply Voltage90V
Capacity of Traction Battery330Ah or 385Ah ( 5 hours capacity)
Power of Electric Motor7.5 kW*2
Speed Regulaing ModeResistance or IGBT
Min. Turning Radius6m
Product KeywordsFactory directly selling,Traction Battery Locomotive




Frame


Constructed in welded steel and suspended by leaf spring on grease bearing seats with tapered roller bearings.


Speed control


In order to achieve continuous and step-less speed regulation, they have an electronic speed controller with high reliability.


Brakes


Mechanical brake to the four wheels by brake shoes.


Sanders


Pneumatic sanding system to the rails.


Battery


The battery housing is constructed in steel plating with an interior anti-acid covering. Each device has 45 pcs series storage lead acid batteries.


Buffers and motor suspension


The locomotive has two buffers with spring shock absorbers to achieve complete shock absorption against collisions. Equally, the motor is suspended from the chassis by a springs brace.


 




 



Factory directly sellingFactory directly sellingFactory directly selling







Related Products




Factory directly selling

Factory directly selling

Factory directly selling

Factory directly selling

 






Company Information




Company profile >>




Xiangtan Electric Locomotive Factory Cor., Ltd. was established in 2000,covering the area of 66,000 square metres, with capacities of 1.5 tonne to 65 tonne locomotive, rail haulage equipment, mining, tunneling and construction sectors. Always being leading manufacturer of mining electric locomotive industry, we owned own famous trademark "SHAOLI' and was issued by ISO 9001,ISO14001,ISO45001,CE certification,National High -Tech Enterprise, China Famous Brand, and etc.


 


 



Factory directly selling

Company Panorama



Factory directly selling

Honor



Factory directly selling

Buildings



Factory directly selling

Office



Factory directly selling

Workship







Certifications




OUR CERTIFICATES


 

 


Factory directly selling





Packaging & Shipping




PACKAGE:


Standard export carton packing.


DELIVERY TIME:


15-25 days after confirming order,detail delivery date should be decided according to production season and order quantity.



Factory directly selling





Our Advantages




OUR ADVANTAGES



Factory directly selling



BRAND


Chinese famous trademark“SHAOLI”




TEAM


25 people top R&D team and 20 people Q&C team




STRONG STRENGTH


the area of 66,000 square metres, many spare parts are produced by our own, including battery, rectifier and charger




QUALITY & PRICE


leading position in the industry promises you the best quality. Complete independent production promises you the best price.








History



Factory directly selling



1995 


 

Xiangtan mine electric locomotive equipment factory was established.




2000


 

Name changed as "Xiangtan electric locomotive factrory Co.,Ltd.




2006


 

The first 30 tonne AC frequency conversion speed regulation electric locomotive in China was produced.




2007


 

"National high-tech enterprises" was issued.




2013


 

"SHAOLI" was issued as "national famous tradmark"




2020


 

The first 65 tonne electric locomotive in China was produced.



 






FAQ




FAQ





1. How can I get the sample to check your quality?


After price confirmation, you can require for samples to check our product's quality.




2. What can I get the price?


We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please tell us in your email so that we will regard you inquiry priority.




3. What is your term of delivery?


We accept EXW, FOB Shenzhen/Shanghai or CIF. You can choose the one which is the most convenient or cost effective for you.




4. What about the delivery time?


Generally, production time is 15-25 days. Of course, it also depends on the quantity of the order.




5. Do you inspect the finished products?


Yes, each step of production and finished products will be came out inspection by QC department before shipping. we also welcome you come our factory to check.







0.0107 s.