Dual power supply control cabinet strong current wiring box rainproof complete set of distribution box switch control box

Share on (1600311565243):


Price:$450.00 - $1,000.00

Quantity:


Product Overview

Description



Specification


item
OEM MNS Drawable Low Voltage Switchgear Origin Place Model Low-voltage complete power distribution cabinet
Place of Origin
Shandong China
Power
400A/3P
Brand Name
OEM
Model Number
XL-21
Color
custom
Size
700*350*1700mm
Rated frequency
50-60HZ








Company Profile




Yantai Gao Sheng Da Precision Machinery Co.,LTD.
10 years+ experience,one-stop service
Yantai Gao Sheng Da Precision Machinery Co.,LTD.
Main products
Inverter housing,Battery cabinet,solar distribution box,Electric cabinet;
TV enclosure,sever cabinet,table legs,floor drain,advertising playing equipment, industrial workbench,perforated sheets;
Metal housing For financial equipment,beauty equipment,medical equipment,etc.;
Aluminium panels for building decoration;
Sheet metal parts,machining parts,CNC engraving
Service
Custom design,OEM order,ODM products
Surface treatment
Powder coating,hot dip galvanized,chromeplate


Laser cutting machine
WMG servo synchronous bending machine
WMG ervo-electric turret punch press


CNC engraving machinine
Shearing machine
Bending machining










FAQ


1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent, pls call us or tell us in your email so that
we will regard your inquiry priority.
2) How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. We will provide you sample for free (value under
USD15), as long as you afford the express freight.
3) How long can I expect to get the sample?
After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 3-7 working
days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own
express account or prepay us if you don't have any account.
4) What about the leading time for mass production?
Honestly, it depends on the order quantity. Normally, 15 days to 20 days after your deposit if no tooling needed.






0.0163 s.