Share on:
We can provide both barrel Chrome Plating Line and rack zinc plating line.
Automatic barrel zinc plating line can be adapted to a variety of small parts, standard parts and various types of plating needs substantial increase in labor productivity. Plating has been provided to expect from the rejection of the full set of water and drying equipment.
1. Large roller can be extremely PP PP-casting materials, CNC machine drilling.
2. The transmission system adopts each station of a transmission gear coupling, electromagnetic speed.
3. Automatic weighing feeding device can reduce labor intensity.
4. passivation automatic folder barrel washing equipment and automatic rejection of water color dryer.
We can offer from plating material dumped water drying until a full set of equipment. Special accumulated rich experience in zincate solution passivated galvanized wash tub and clip color equipment, roller and PP template for a national patent.
Chrome plating equipment main configuration:
1, PLC machine adopts Japanese Mitsubishi Electric Corporation products;
2, inverter byJapan's Mitsubishi Electric Corporation products;
3, touch screen with Kunlun-state electrical company's products;
4, proximity switches and photoelectric switches from Germany Turck Electric products;
5, contactors and thermal relays Suzhou Siemens Electric Company products;
6, chemical degreasing tank 304 stainless steel electric heating tube heating, power of 48KW, 220V;
7, hot water tank made of 304 stainless steel electric heating tube heating, power 10KW, 220V;
8, anode lift sump 304 stainless steel electric heating tube heating, power of 24KW, 220V;
9, activation tank using 304 stainless steel electric heating tube heating, power 10KW, 220V;
10,Automatic temperature control using Yan Ling Electric Company products;
11, Truck traces using Shanghai Nanyang Fujikura's advanced 40-core flat cable;
512, All control cabinet, reasonable design, elegant, exquisite appearance, easy to operate, so that moisture and corrosion. Control cabinet wiring structured, clear and accurate line number, all elements have clear labeling on the operation panel in English.
13, system with automatic and manual control functions,under normal circumstances, the system is in automatic operation, such as the residence time of the workpiece in each groove, traffic levels and lifting speed. Each lane start, stop, promotion, reduction in operation and the shift can be controlled manually, but this time the other part is still controlled automatically. When a local problem in need of repair, driving to go to the manual operation, the production line can continue to run.
14, System program with interrupt, power and memory function, easy to handle unexpected situations.
15, system is equipped with the full range of emergency stop devices to prevent accidents.
16, for the user product diversity, the system can be easily modified to run the process sequence.
Acid Zinc Plating Equipment/acid Chrome Plating Line/acid Barrel Plating Line - Buy Electroplating Equipment Plating Equipment,Barrel Zinc Plating/acid Zinc Plating,Zinc Plating Equipment/zinc Plating Line Product on Alibaba.com
Item | |
1, Material of tank | 3mm304 stainless steel , PP |
2,Material of framework | Square steel tube |
3,Control system | PLC,computer control |
4,Heating model | Electronic, steam, hot water |
5,Model of transporter | Automatic ,semi-automatic ,Manual |
6.Surrounding equipment | Rectifiers, filters,pipe, air blower,waste gas treatment system |
7,Warranty | 12 months. |
8,Advantages | Flexible design,safe,stable and high strength, automatic weighting and loading. |
9,Applications | Different kind of plating for metal products. |
10,Contactor (switch ) and thermal relay | Siemens Brand . |
Zinc plating line details:
For more information, please visit our web site: www.rainbowtechnology.net
For any questions, please feel free to contact me:
Doris Wang
Wechat/Whatsapp: +86 18003610956
1. What is the advantage of your production line
1) high effect :We can guarantee our Line continuous working more than 20 hours per day.
2) Labor saving: Loading and unloading in one team/location.So it can save 50% workers.
2. What is the brand of your electrical control parts?
1)Our line fully equipped with electric system.
2)Electric elements: We use World famous brand Siemens. good quality and more steady.
3. What is your payment term?
30% down payment, the balance By T/T (OR L/C) before shipment.
4. Installation and commissioning
1) Period: around 30-45 days (depends on the project).
2) Process: Supplier send main engineer, mechanical engineer, electric engineer and plastic person to client's factory to guide installation and provide trainning.
During the installation period, buyer should provide at least 2-3 persons to learn how to operate. Buyer shall bear all cost of supplier's persons for the installation and commissioning, such as travel cost, boarding and lodging cost, communication cost, salaries, etc.