Petrol filling station pipes HDPE oil pipes conductive secondary containment upp pipeline

Share on (1600344852905):


Price:$0.74 - $1.54

Quantity:


Product Overview

Description



Product Description


PE100 High Density Polyethylene HDPE Pipe FLW buried pipeline(non-conductive static) coils

Product Description of HDPE FLW buried pipeline
CHUANGRONG FLW buried pipeline system advantages:
1. Double protection,Zero penetration:FLW oil pipeline system eliminates the possibility of fuel Spills into the
environment, thus protecting the soil and water from pollution effectively.
2.Safe and efficient installation, Low cost:FLW oil pipeline welding uses intelligent welding machine which lets
double pipe connected completely. FLW oil pipeline system is without concrete trench and installation costs is
greatly reduced.
3.24 hours monitoring:FLW petroleum pipeline system has a leak detector, the pipeline for 24 hour monitoring.
Once leaked, Indoor monitoring system will alarm.
4.Collision,Puncture,Tensile,Anti-ground motion capability.




Basic Information


Specification of HDPE FLW buried pipeline


Product Code
Description
FLW-54EC6
OD54mm single layer pipe, 50m/Roll
FLW-63EC6
OD63mm single layer pipe, 50m/Roll
FLW-65/54EC6
Outer pipe with OD65mm,Inner pipe with OD54mm double layer pipe, 5.8m length
FLW-75/63EC6
Outer pipe with OD75mm,Inner pipe with OD63mm double layer pipe, 5.8m length




Product Code
Description
FLW-54EC6
OD54mm single layer pipe,5.8m/Length
FLW-63EC6
OD63mm single layer pipe,5.8m/Length
FLW-90EC6
OD90mm single layer pipe,5.8m/Length
FLW-110EC6
OD110mm single layer pipe,5.8m/Length
FLW-65/54EC6
Outer pipe with OD65mm,Inner pipe with OD54mm double layer pipe, 5.8m length
FLW-75/63EC6
Outer pipe with OD75mm,Inner pipe with OD63mm double layer pipe, 5.8m length
FLW-125/110EC6
Outer pipe with OD125mm,Inner pipe with OD110mm double layer pipe, 5.8m length


Certificate:ISO, CE,BV,SGS
Packing Method:Normal export packing.
Pipe dia.54mm-75/63mm can be in coils with 50m length;
Pipe dia. 54~125/110mm in bars with 5.8m length.
Production Lead Time:Depending on the order quantity.
Normally about 2 weeks days for 20ft container, 3·4 weeks for a 40ft container.
Supply Ability:100000 Ton/Year
Payment Method:T/T, L/C at sight,West Union
Trading Method:EXW, FOB, CFR, CIF,DDU


Applications




0.1884 s.