Share on:
High quality 08BSS-2 Stainless steel 304 roller chain connecting link
Name | High quality 08BSS-2 Stainless steel 304 roller chain connecting link |
Application Environment | In special environments such as medicines, water and high temperatures |
Feature | High strength |
Material | Stainless steel 304 |
Construction | Riveted |
Delivery time | By express: DHL, FedEx, UPS or TNT, it usually takes about 3-6 work days to arrive. |
By air: It usually takes about 3-6 work days to arrive at airport. | |
By sea: It usually takes about 15-45 works days to |
Instructions for use of linear actuators:
1. The putter cannot work continuously for a long time. The working efficiency of the putter is 10% -20%. It can work continuously for 2 minutes and rest for more than 18 minutes.
2. The built-in limit switch of the push rod automatically stops when reaching the end of the head, and stops when any power is cut off in the middle
We're a professional team in doing international business. Any inquiry will be replied back within 24 hours with knowledgeable and valueable details. It is easy and efficient to deal with us.
How to order:
After-Sales Service:
We have our own factory located in China.
Why choose us?
1. Factory direct with pretty competitive prices
2. Quality guaranteed after the check of QA department
3. OEM order is highly welcomed and easily achieved. All customized requests are available, including customized logo, packaging box, details of products etc.
4. Fast delivery time. 1-2 days shipped out after payment.
5. Professional Team. All members of our team have been in the field at least 3 years with professional knowledges and kind services.