Inspection items | Parameter values | ||||||||||||
State in container | After stirring, there is no hard block and it is uniform | ||||||||||||
Coating appearance | Flat, no play mark, wrinkle, pinhole, bubble and other defects | ||||||||||||
Drying time H (25℃) | Surface dry ≤8 | ||||||||||||
Full dry ≤24 | |||||||||||||
Hardness/H | ≥H | ||||||||||||
Impact resistance Steel ball(50mm*500g 100cm high) | Coating without crack, no peeling | ||||||||||||
Abrasion resistance(750g/500r)g | ≤0.020 | ||||||||||||
Slip resistance (dry friction coefficient) | ≥0.60 | ||||||||||||
Tensile bond strength, 7d standard condition/MPa | ≥2.0 | ||||||||||||
Low/high temperature resistance test | Can withstand -40℃ to 120℃ cycle change | ||||||||||||
Compressive strength / MPa | ≥50 | ||||||||||||
Water absorption rate % | ≤0.10% | ||||||||||||
Water resistance (168H) | No foaming, no peeling, allow slight discoloration | ||||||||||||
Chemical resistance | 15% NaOH solution 72h | No foaming, no peeling, allow slight discoloration | |||||||||||
10% HC1 solution 72h | No foaming, no peeling, allow slight discoloration | ||||||||||||
120# solvent gasoline 72h | No foaming, no peeling, allow slight discoloration | ||||||||||||



Process name | Specific practice and requirements | ||||||||||||
Base surface treatment | 1.On the base surface for heavy sandblasting or milling processing, if there is any drainage hole, should be near and around the vertical pendant for hook type cutting. 2.Draw a diagonal line on the base and cut along the line to a depth of about 20mm to prevent shrinkage of the coating. 3.Clean up the ground sand and remove the residual dust with a vacuum cleaner. | ||||||||||||
Sealing coating | 1. Use the interface agent to spread evenly on the clean base surface. 2. Then spread the quartz sand over the still wet primer.The materials must be used up within 25 minutes after mixing. 3. After the primer is solidified, remove the excess quartz sand, polish the base surface and remove the residual dust with industrial vacuum cleaner. | ||||||||||||
Paint coating | 1. After the closed layer is dry, use the four component materials to mix carefully and stir for about 3 minutes to reach a smooth and uniform mortar state. 2. Smooth the material with a flat knife and evenly scrape it on the surface of the dry and solid closed layer to the required thickness. It is not advisable to wipe it repeatedly to ensure the uniform distribution of liquid materials. 3. Roll the surface evenly with a water-wetted wool roller.The materials must be used up within 25 minutes after mixing. | ||||||||||||